Cisco Systems N3KC3524P10G manual Cabinet and Rack Requirements

Page 73

Se n d d o c u m e n t c o m m e n t s t o n ex u s 3 k - d o c f e e d b a ck @ c i sc o . c o m

A P P E N D I X A

Cabinet and Rack Specifications

This appendix provides the requirements for cabinet and rack installation and includes the following sections:

Cabinet and Rack Requirements, page A-1

Cable Management Guidelines, page A-3

Cabinet and Rack Requirements

This section provides the requirements for the following types of cabinets and racks, assuming an external ambient air temperature range of 0 to 104oF (0 to 40oC):

Standard perforated cabinets

Solid-walled cabinets with a roof fan tray (bottom to top cooling)

Standard open racks

Note If you are selecting an enclosed cabinet, we recommend one of the thermally validated types, either standard perforated or solid-walled with a fan tray.

Note Do not use racks that have obstructions (such as power strips), because the obstructions could impair access to field-replaceable units (FRUs).

This section includes the following topics:

General Requirements for Cabinets and Racks, page A-1

Requirements Specific to Perforated Cabinets, page A-2

Requirements Specific to Standard Open Racks, page A-2

General Requirements for Cabinets and Racks

The cabinet or rack must be one of the following types:

Standard 19-inch (48.3 cm) (four-post EIA cabinet or rack, with mounting rails that conform to English universal hole spacing per section 1 of ANSI/EIA-310-D-1992). See the “Requirements Specific to Perforated Cabinets” section on page A-2.

Cisco Nexus 3000 Series Hardware Installation Guide

 

OL-25338-04

A-1

 

Image 73
Contents Americas Headquarters Cisco Nexus 3000 Series Hardware Installation GuidePage N T E N T S Airflow Direction Chassis Weight Chassis and Module Information E-4 Contents Organization AudienceChapter and Title Description Bewaar Deze Instructies ConventionsGuarde Estas Instruções Spara Dessa Anvisningar GEM Disse Anvisninger Xii Related Documentation Installation and Upgrade Guides Configuration GuidesCommand References Error and System MessagesObtaining Documentation and Submitting a Service Request Xvi Airflow Direction Layer 3 License Part Number Cisco Nexus 3016 SwitchFront View of the Cisco Nexus 3016 Switch Chassis for the Cisco Nexus 3016 SwitchID LED Ports for the Cisco Nexus 3016 SwitchAirflow Direction Power Supply Part Number Power Supply for the Cisco Nexus 3016 SwitchPort Connections for the Cisco Nexus 3016 Switch Fan Tray for the Cisco Nexus 3016 SwitchPart Number Transceivers and Cables Chassis for the Cisco Nexus 3048 Switch Cisco Nexus 3048 SwitchPower Supply Airflow Direction Layer 3 License Part Number Front View of the Cisco Nexus 3048 Switch Rear View of the Cisco Nexus 3048 Switch Ports for the Cisco Nexus 3048 SwitchPower Supply for the Cisco Nexus 3048 Switch Port Connections for the Cisco Nexus 3048 Switch Fan Tray for the Cisco Nexus 3048 SwitchCisco Nexus 3064 Switch Front View of the Cisco Nexus 3064 Switch Chassis for the Cisco Nexus 3064 SwitchRear View of the Cisco Nexus 3064 Switch Ports for the Cisco Nexus 3064 SwitchFan Tray for the Cisco Nexus 3064 Switch Power Supply for the Cisco Nexus 3064 SwitchPort Connections for the Cisco Nexus 3064 Switch Chassis for the Cisco Nexus 3548 Switch Cisco Nexus 3548 SwitchPower Supplies Fan tray Rear View of the Cisco Nexus 3548 Switch Ports for the Cisco Nexus 3548 SwitchFan Tray for the Cisco Nexus 3548 Switch Power Supply for the Cisco Nexus 3548 SwitchPort Connections for the Cisco Nexus 3548 Switch SFP-10G-ER Cisco Nexus 3000 Series Hardware Installation Guide Statement Installation Options with Racks and Cabinets Preparing for InstallationAirflow Direction Installation Guidelines Chassis WeightCisco Nexus 3000 Series Hardware Installation Guide Unpacking and Inspecting the Switch Installing the SwitchChassis Quantity Part DescriptionStep Installing the Slider Rails Sliding the Chassis Into the Rack Electrostatic Discharge Damage, page·2-14 Grounding the SwitchEnvironment Severity Level Grounding Recommendations Proper Grounding PracticesEstablishing the System Ground Grounding the Cisco Nexus 3000 Series Chassis Required Tools and EquipmentGrounding a Cisco Nexus 3000 Series Chassis Preventing Electrostatic Discharge DamageOL-25338-04 Attaching the ESD Wrist Strap to the System Ground Lug Screw Starting the Switch 331410 OL-25338-04 Cisco Nexus 3000 Series Hardware Installation Guide Connecting to the Network Preparing for Network Connections Connecting to the Console PortConnecting to a Server Connecting to the Management PortInstalling an SFP or SFP+ Transceiver Installing and Replacing SFP or SFP+ TransceiversReplacing an SFP or SFP+ Transceiver Installing Optical Cables into SFP or SFP+ TransceiversInstalling an Optical Cable into an SFP or SFP+ Transceiver Maintaining SFP and SFP+ Transceivers and Fiber-Optic Cables Cisco Nexus 3000 Series Hardware Installation Guide Removing an AC Power Supply Replacing a Power SupplyInstalling an AC Power Supply Removing a DC Power Supply Replacing a Fan Tray Installing a DC Power SupplyRemoving a Fan Tray Removing a Fan Tray, Installing a Fan Tray,Installing a Fan Tray General Requirements for Cabinets and Racks Cabinet and Rack RequirementsRequirements Specific to Standard Open Racks Requirements Specific to Perforated CabinetsCable Management Guidelines Cisco Nexus 3000 Series Hardware Installation Guide Environmental Specifications Switch SpecificationsSwitch Height Width Depth Weight Property Cisco Nexus 3000 Series Switch Power SpecificationsProperty AC Power Supply N2200-PAC-400 W Property AC Power Supply N2200-PAC-400 W Appendix B Technical Specifications Power Specifications Console Cable Cable and Connector SpecificationsConsole Port Supported Power Cords and PlugsLength Description Feet Meters IllustrationCAB-N5K6A-NA CAB-9K10A-AU Figure C-6 SFS-250V-10A-ID CAB-9K10A-SW CAB-N5K6A-NA Figure C-15 Jumper Power CordLED Descriptions Component Chassis and Module LED DescriptionsStatus Description Port LEDs Power Supply StatusCondition Fail LED Status AmberRight Off No activity Blinking green Activity Site Preparation Checklist Site Planning and Maintenance RecordsTask No Planning Activity Verified By Time Date Contact and Site Information Chassis and Module Information D E IN-2 IN-3 IN-4 IN-5 IN-6