Appendix E Site Planning and Maintenance Records

Site Preparation Checklist

Se n d d o c u m e n t c o m m e n t s t o n ex u s 3 k - d o c f e e d b a ck @ c i sc o . c o m

Table E-1

 

Site Planning Checklist

 

 

 

 

 

 

 

 

Task No.

Planning Activity

Verified By

Time

Date

 

 

 

 

 

1

Space evaluation:

 

 

 

 

Space and layout

 

 

 

 

Floor covering

 

 

 

 

Impact and vibration

 

 

 

 

Lighting

 

 

 

 

Maintenance access

 

 

 

 

 

 

 

 

2

Environmental evaluation:

 

 

 

 

Ambient temperature

 

 

 

 

Humidity

 

 

 

 

Altitude

 

 

 

 

Atmospheric contamination

 

 

 

 

airflow

 

 

 

 

 

 

 

 

3

Power evaluation:

 

 

 

 

Input power type

 

 

 

 

Power receptacles1

 

 

 

 

Receptacle proximity to the

 

 

 

 

 

equipment

 

 

 

 

Dedicated circuit for power supply

 

 

 

 

Dedicated (separate) circuits for

 

 

 

 

 

redundant power supplies

 

 

 

 

UPS2 for power failures

 

 

 

4

Grounding evaluation:

 

 

 

 

Circuit breaker size

 

 

 

 

CO ground (AC- powered systems)

 

 

 

 

 

 

 

 

5

Cable and interface equipment

 

 

 

 

evaluation:

 

 

 

 

Cable type

 

 

 

 

Connector type

 

 

 

 

Cable distance limitations

 

 

 

 

Interface equipment (transceivers)

 

 

 

 

 

 

 

 

6

EMI3 evaluation:

 

 

 

 

Distance limitations for signaling

 

 

 

 

Site wiring

 

 

 

 

RFI4 levels

 

 

 

1.Verify that the power supply installed in the chassis has a dedicated AC source circuit.

2.UPS = uninterruptible power supply.

Cisco Nexus 3000 Series Hardware Installation Guide

 

E-2

OL-25338-04

 

 

 

Image 94
Contents Cisco Nexus 3000 Series Hardware Installation Guide Americas HeadquartersPage N T E N T S Airflow Direction Chassis Weight Chassis and Module Information E-4 Contents Organization AudienceChapter and Title Description Conventions Bewaar Deze InstructiesGuarde Estas Instruções Spara Dessa Anvisningar GEM Disse Anvisninger Xii Related Documentation Command References Configuration GuidesInstallation and Upgrade Guides Error and System MessagesObtaining Documentation and Submitting a Service Request Xvi Cisco Nexus 3016 Switch Airflow Direction Layer 3 License Part NumberChassis for the Cisco Nexus 3016 Switch Front View of the Cisco Nexus 3016 SwitchPorts for the Cisco Nexus 3016 Switch ID LEDPower Supply for the Cisco Nexus 3016 Switch Airflow Direction Power Supply Part NumberPort Connections for the Cisco Nexus 3016 Switch Fan Tray for the Cisco Nexus 3016 SwitchPart Number Transceivers and Cables Chassis for the Cisco Nexus 3048 Switch Cisco Nexus 3048 SwitchPower Supply Airflow Direction Layer 3 License Part Number Front View of the Cisco Nexus 3048 Switch Ports for the Cisco Nexus 3048 Switch Rear View of the Cisco Nexus 3048 SwitchPower Supply for the Cisco Nexus 3048 Switch Fan Tray for the Cisco Nexus 3048 Switch Port Connections for the Cisco Nexus 3048 SwitchCisco Nexus 3064 Switch Chassis for the Cisco Nexus 3064 Switch Front View of the Cisco Nexus 3064 SwitchPorts for the Cisco Nexus 3064 Switch Rear View of the Cisco Nexus 3064 SwitchPower Supply for the Cisco Nexus 3064 Switch Fan Tray for the Cisco Nexus 3064 SwitchPort Connections for the Cisco Nexus 3064 Switch Cisco Nexus 3548 Switch Chassis for the Cisco Nexus 3548 SwitchPower Supplies Fan tray Ports for the Cisco Nexus 3548 Switch Rear View of the Cisco Nexus 3548 SwitchPower Supply for the Cisco Nexus 3548 Switch Fan Tray for the Cisco Nexus 3548 SwitchPort Connections for the Cisco Nexus 3548 Switch SFP-10G-ER Cisco Nexus 3000 Series Hardware Installation Guide Statement Installation Options with Racks and Cabinets Preparing for InstallationAirflow Direction Chassis Weight Installation GuidelinesCisco Nexus 3000 Series Hardware Installation Guide Installing the Switch Unpacking and Inspecting the SwitchQuantity Part Description ChassisStep Installing the Slider Rails Sliding the Chassis Into the Rack Grounding the Switch Electrostatic Discharge Damage, page·2-14Proper Grounding Practices Environment Severity Level Grounding RecommendationsEstablishing the System Ground Required Tools and Equipment Grounding the Cisco Nexus 3000 Series ChassisPreventing Electrostatic Discharge Damage Grounding a Cisco Nexus 3000 Series ChassisOL-25338-04 Attaching the ESD Wrist Strap to the System Ground Lug Screw Starting the Switch 331410 OL-25338-04 Cisco Nexus 3000 Series Hardware Installation Guide Connecting to the Network Connecting to the Console Port Preparing for Network ConnectionsConnecting to the Management Port Connecting to a ServerInstalling and Replacing SFP or SFP+ Transceivers Installing an SFP or SFP+ TransceiverInstalling Optical Cables into SFP or SFP+ Transceivers Replacing an SFP or SFP+ TransceiverInstalling an Optical Cable into an SFP or SFP+ Transceiver Maintaining SFP and SFP+ Transceivers and Fiber-Optic Cables Cisco Nexus 3000 Series Hardware Installation Guide Replacing a Power Supply Removing an AC Power SupplyInstalling an AC Power Supply Removing a DC Power Supply Installing a DC Power Supply Replacing a Fan TrayRemoving a Fan Tray, Installing a Fan Tray, Removing a Fan TrayInstalling a Fan Tray Cabinet and Rack Requirements General Requirements for Cabinets and RacksRequirements Specific to Perforated Cabinets Requirements Specific to Standard Open RacksCable Management Guidelines Cisco Nexus 3000 Series Hardware Installation Guide Environmental Specifications Switch SpecificationsSwitch Height Width Depth Weight Property Cisco Nexus 3000 Series Switch Power SpecificationsProperty AC Power Supply N2200-PAC-400 W Property AC Power Supply N2200-PAC-400 W Appendix B Technical Specifications Power Specifications Cable and Connector Specifications Console CableLength Supported Power Cords and PlugsConsole Port Description Feet Meters IllustrationCAB-N5K6A-NA CAB-9K10A-AU Figure C-6 SFS-250V-10A-ID CAB-9K10A-SW CAB-N5K6A-NA Jumper Power Cord Figure C-15LED Descriptions Component Chassis and Module LED DescriptionsStatus Description Condition Power Supply StatusPort LEDs Fail LED Status AmberRight Off No activity Blinking green Activity Site Planning and Maintenance Records Site Preparation ChecklistTask No Planning Activity Verified By Time Date Contact and Site Information Chassis and Module Information D E IN-2 IN-3 IN-4 IN-5 IN-6