Cisco Systems IE 3000 warranty Installation Warning Statements

Page 13

Cisco IE 3000 Switch Getting Started Guide

Airflow around the switch and through the vents is unrestricted. To prevent the switch from overheating, these must be the minimum clearances:

Top and bottom: 4.13 in. (105 mm)

Left and right: 3.54 in. (90 mm)

Front: 2.56 in. (65 mm)

Temperature surrounding the unit does not exceed 140°F (60°C), the maximum ambient temperature of the switch.

Note When the switch is installed in an industrial enclosure, the temperature within the enclosure is greater than normal room temperature outside the enclosure.

Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent lighting fixtures.

This product is grounded to a bare metal surface, such as a ground bus, a grounded DIN rail, or a grounded bare rack. Use a zinc-plated, yellow-chromate steel DIN rail to assure proper grounding. The use of other materials (such as aluminum, plastic, and so on) that can corrode, oxidize, or are poor conductors can result in improper or intermittent grounding. When grounding to a DIN rail, secure the DIN rail to the mounting surface approximately every 7.8 in. (200 mm), and use appropriate end-anchors.

Installation Warning Statements

Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. Statement 1003

Warning This product relies on the building’s installation for short-circuit (overcurrent) protection. Ensure that the protective device is rated not greater than: 5A. Statement 1005

 

 

Cisco IE 3000 Switch Getting Started Guide

 

 

 

 

 

 

OL-16234-01

 

 

13

 

 

 

Image 13
Contents About This Guide Cisco IE 3000 Switch Getting Started GuideTaking Out What You Need Connecting Expansion Modules 202334 203759 202335 Running Express Setup Connect power to the switch Connection Cisco IE 3000 Switch Getting Started Guide Using the Device Manager Managing the SwitchRefreshing the PC IP Address Downloading Cisco Network Assistant Command-Line InterfaceOther Management Options Installing the SwitchBefore You Begin Equipment That You SupplyInstallation Warning Statements 140F 60C Statement Cisco IE 3000 Switch Getting Started Guide Foot Latch Mounting the Switch to a DIN Rail or to the Rack AdapterInch 12.7 mm Grounding the SwitchFollow these steps to prepare the DC power cable Wiring the DC Power SourceInch 6.6 mm Attaching the Power and Relay Connector Optional Procedures Connecting to the Switch PortsConnecting to 10/100 and 10/100/1000 Ports Installing SFP Modules and Connecting to Ports Connecting to 100BASE-FX Ports Connecting to Dual-Purpose PortsVerifying Port Connectivity Case of Difficulty Troubleshooting Express SetupResetting the Switch For More Information Accessing Online HelpCisco One-Year Limited Hardware Warranty Terms Obtaining Documentation and Submitting a Service RequestDuration of Hardware Warranty To Receive a Return Materials Authorization RMA Number Cisco IE 3000 Switch Getting Started Guide Cisco IE 3000 Switch Getting Started Guide