Cisco Systems
SFS 3012
manual
3Closing the Ejector Lever
Specifications
Install
11Removing a Pinch Connector
Power Supply Modules
Features
InfiniBand Switch Cards
Page 26
8
7.
Push the ejector lever up until it clicks into place.
Figure
2-3:
Closing the Ejector Lever
Page 25
Page 27
Image 26
Page 25
Page 27
Contents
Part Number OL-7722-01 Product ID
Page
Contents Regulatory Notices Vii
Install and Boot the Topspin
Specifications and Compliance
Page
Electrical Cautions
FCC Statement Safety Information
Regulatory Notices
Viii
General Cautions
Laser Cautions
Contact Information
Laser Specs
Product Registration
Thank YOU for Purchasing Your Topspin Product
Xii
Standard Product Agreement
Xiv
Page
Xvi
Xvii
Xviii
Topspin 360 Overview
Introduction
Unified Fabric
Features
Performance
Transparent Topology
Redundancy and High-Availability
Scalability
Page
Topspin 360 Components
Install a Controller Card
Controller Cards
2Inserting the Controller Card
3Closing the Ejector Lever
Ethernet and Fibre Channel Gateways
Replacing and Updating Your Gateways
InfiniBand Switch Cards
Install an Ethernet or Fibre Channel Gateway
Install InfiniBand Switch Cards
7Inserting a Switch Card
8Closing Switch Ejector Levers
Power Supply Modules
Remove InfiniBand Switch Cards
Install Power Supply Modules
10Power Supply Modules
Blower Trays
Removing a Power Supply
Install Blower Trays
Removing Blower Trays
Page
Page
Install and Boot the Topspin
Prepare the Site for the Topspin
Read the Cautionary Statements
Install Topspin 360 Components
Rack the Topspin
Prepare the Physical Environment for Topspin
1Positioning the Side Flanges
3Rail Positioning
4Attaching Rails from the Front
5Attaching Rails from the Back
6Positioning the Chassis on the Rails
Attach a Serial Console Cable to a PC or Terminal
8Securing the Chassis to the Rails
Boot your Topspin 360 and Configure Basic Connectivity
Assign a Static IP Address
Enter the interface mgmt-ethernet command
Obtain an IP Address with Dhcp
Connect InfiniBand Hosts
9Fully Installed IB Cable with Pinch Connector
11Removing a Pinch Connector
12Removing a Pull Connector
Manage the Topspin
Viewing and Updating the Software Image on the Chassis
View the Software Image Version with the CLI
An installed image file will have a slash / in the name
View the Software Image Version with the GUI
Upgrade the Software Image with the CLI
14View Current Image of an Individual Card
Upgrade the Software Image with the GUI
15Copy an Image File to the Switch
16Specify the Boot Configuration
Delete an Image with the CLI
Select Maintenance File Management
Delete an Image with the GUI
Page
Topspin 360 Field Replaceable Units
Expansion Modules
Installing an InfiniBand Switch Card
Configuring a New InfiniBand Switch Card
Update the switch card firmware. Enter the install command
Installing a Power Supply
Power Modules
Removing an InfiniBand Switch Card
2Power Supply Module Positioning
Installing a Blower Tray
Replacing Blower Trays
Removing a Blower Tray
Page
Topspin 360 LEDs
Topspin 360 System LED
Activity Indication
Power Supply LEDs
1Power Supply LEDs
Blower Tray LEDs
2Blower Tray LEDs
Controller Card LEDs
LED State Indication
IB Switch Card LEDs
IB Port LEDs
Fibre Channel Gateway LEDs
FC Port LEDs
Ethernet Gateway LEDs
Ethernet Port LEDs
Specifications and Compliance
General Specifications
Laser Specs
Electrical Specifications
Certifications/Regulatory
Topspin P/N Application Optical Parameters
Page
Index
Related manuals
Manual
28 pages
17.41 Kb
Top
Page
Image
Contents