Cisco Systems SFS 3012 manual Removing a Power Supply, Install Blower Trays

Page 33

15

NOTE: The power socket on the back (service end) of the Topspin 360 corresponds to the power supply module on the same side of the Server Switch.

Removing a Power Supply

To remove the power supply, perform the following steps:

1.Remove the power cord from the power supply.

2.Disengage the power supply by pulling it toward you.

3.Slide the power supply out of the chassis.

4.Fasten a blanking panel to the empty chassis bay to ensure appropriate cooling.

NOTE: The blanking panel is a flat sheet of metal with the same dimensions as the power module faceplate.

Blower Trays

The hot-swappable blower trays (fans) of your Topspin 360 maintain the internal temperature of your Server Switch. You do not need to turn off power to the chassis to replace a blower tray. Access the blower tray from the front (bezel end) of the Topspin 360 chassis. Figure 2-11displays the blower trays in the chassis.

Blower Tray

Blower Tray

Figure 2-11: Blower Trays

NOTE: Your chassis requires two fully-functioning blower modules at all times.

Install Blower Trays

To insert a blower tray, perform the following steps:

1.Ground yourself appropriately.

2.Remove the blower tray from any packaging.

Image 33
Contents Part Number OL-7722-01 Product ID Page Contents Regulatory Notices Vii Install and Boot the Topspin Specifications and Compliance Page FCC Statement Safety Information Regulatory NoticesElectrical Cautions Viii Laser Cautions General CautionsLaser Specs Contact InformationThank YOU for Purchasing Your Topspin Product Product RegistrationXii Standard Product Agreement Xiv Page Xvi Xvii Xviii Introduction Topspin 360 OverviewPerformance FeaturesUnified Fabric Transparent TopologyScalability Redundancy and High-AvailabilityPage Topspin 360 Components Controller Cards Install a Controller Card2Inserting the Controller Card 3Closing the Ejector Lever Replacing and Updating Your Gateways Ethernet and Fibre Channel GatewaysInstall an Ethernet or Fibre Channel Gateway InfiniBand Switch Cards7Inserting a Switch Card Install InfiniBand Switch Cards 8Closing Switch Ejector Levers Remove InfiniBand Switch Cards Power Supply Modules10Power Supply Modules Install Power Supply ModulesRemoving a Power Supply Install Blower TraysBlower Trays Removing Blower Trays Page Page Prepare the Site for the Topspin Install and Boot the TopspinRack the Topspin Install Topspin 360 ComponentsRead the Cautionary Statements Prepare the Physical Environment for Topspin1Positioning the Side Flanges 3Rail Positioning 4Attaching Rails from the Front 5Attaching Rails from the Back 6Positioning the Chassis on the Rails 8Securing the Chassis to the Rails Attach a Serial Console Cable to a PC or TerminalAssign a Static IP Address Boot your Topspin 360 and Configure Basic ConnectivityObtain an IP Address with Dhcp Enter the interface mgmt-ethernet commandConnect InfiniBand Hosts 9Fully Installed IB Cable with Pinch Connector 11Removing a Pinch Connector Manage the Topspin 12Removing a Pull ConnectorView the Software Image Version with the CLI Viewing and Updating the Software Image on the ChassisView the Software Image Version with the GUI An installed image file will have a slash / in the name14View Current Image of an Individual Card Upgrade the Software Image with the CLIUpgrade the Software Image with the GUI 15Copy an Image File to the Switch Delete an Image with the CLI 16Specify the Boot ConfigurationDelete an Image with the GUI Select Maintenance File ManagementPage Expansion Modules Topspin 360 Field Replaceable UnitsConfiguring a New InfiniBand Switch Card Installing an InfiniBand Switch CardUpdate the switch card firmware. Enter the install command Power Modules Removing an InfiniBand Switch CardInstalling a Power Supply 2Power Supply Module Positioning Replacing Blower Trays Installing a Blower TrayRemoving a Blower Tray Page Topspin 360 LEDs Activity Indication Topspin 360 System LED1Power Supply LEDs Power Supply LEDs2Blower Tray LEDs Blower Tray LEDsLED State Indication Controller Card LEDsIB Port LEDs IB Switch Card LEDsFC Port LEDs Fibre Channel Gateway LEDsEthernet Port LEDs Ethernet Gateway LEDsGeneral Specifications Specifications and ComplianceElectrical Specifications Certifications/RegulatoryLaser Specs Topspin P/N Application Optical Parameters Page Index
Related manuals
Manual 28 pages 17.41 Kb