Cisco Systems
SFS 3012
manual
6Positioning the Chassis on the Rails
Specs
Install
11Removing a Pinch Connector
Power Supply Modules
Features
InfiniBand Switch Cards
Page 43
25
12. Slide the Topspin 360 onto the rails as shown in
Figure
3-6
and
Figure
3-7
.
Figure
3-6:
Positioning the Chassis on the Rails
Figure
3-7:
Sliding the Chassis onto the Rails
Page 42
Page 44
Image 43
Page 42
Page 44
Contents
Part Number OL-7722-01 Product ID
Page
Contents Regulatory Notices Vii
Install and Boot the Topspin
Specifications and Compliance
Page
Regulatory Notices
FCC Statement Safety Information
Electrical Cautions
Viii
Laser Cautions
General Cautions
Laser Specs
Contact Information
Thank YOU for Purchasing Your Topspin Product
Product Registration
Xii
Standard Product Agreement
Xiv
Page
Xvi
Xvii
Xviii
Introduction
Topspin 360 Overview
Transparent Topology
Features
Performance
Unified Fabric
Scalability
Redundancy and High-Availability
Page
Topspin 360 Components
Controller Cards
Install a Controller Card
2Inserting the Controller Card
3Closing the Ejector Lever
Replacing and Updating Your Gateways
Ethernet and Fibre Channel Gateways
Install an Ethernet or Fibre Channel Gateway
InfiniBand Switch Cards
7Inserting a Switch Card
Install InfiniBand Switch Cards
8Closing Switch Ejector Levers
Remove InfiniBand Switch Cards
Power Supply Modules
10Power Supply Modules
Install Power Supply Modules
Install Blower Trays
Removing a Power Supply
Blower Trays
Removing Blower Trays
Page
Page
Prepare the Site for the Topspin
Install and Boot the Topspin
Prepare the Physical Environment for Topspin
Install Topspin 360 Components
Rack the Topspin
Read the Cautionary Statements
1Positioning the Side Flanges
3Rail Positioning
4Attaching Rails from the Front
5Attaching Rails from the Back
6Positioning the Chassis on the Rails
8Securing the Chassis to the Rails
Attach a Serial Console Cable to a PC or Terminal
Assign a Static IP Address
Boot your Topspin 360 and Configure Basic Connectivity
Obtain an IP Address with Dhcp
Enter the interface mgmt-ethernet command
Connect InfiniBand Hosts
9Fully Installed IB Cable with Pinch Connector
11Removing a Pinch Connector
Manage the Topspin
12Removing a Pull Connector
View the Software Image Version with the CLI
Viewing and Updating the Software Image on the Chassis
View the Software Image Version with the GUI
An installed image file will have a slash / in the name
14View Current Image of an Individual Card
Upgrade the Software Image with the CLI
Upgrade the Software Image with the GUI
15Copy an Image File to the Switch
Delete an Image with the CLI
16Specify the Boot Configuration
Delete an Image with the GUI
Select Maintenance File Management
Page
Expansion Modules
Topspin 360 Field Replaceable Units
Configuring a New InfiniBand Switch Card
Installing an InfiniBand Switch Card
Update the switch card firmware. Enter the install command
Removing an InfiniBand Switch Card
Power Modules
Installing a Power Supply
2Power Supply Module Positioning
Replacing Blower Trays
Installing a Blower Tray
Removing a Blower Tray
Page
Topspin 360 LEDs
Activity Indication
Topspin 360 System LED
1Power Supply LEDs
Power Supply LEDs
2Blower Tray LEDs
Blower Tray LEDs
LED State Indication
Controller Card LEDs
IB Port LEDs
IB Switch Card LEDs
FC Port LEDs
Fibre Channel Gateway LEDs
Ethernet Port LEDs
Ethernet Gateway LEDs
General Specifications
Specifications and Compliance
Certifications/Regulatory
Electrical Specifications
Laser Specs
Topspin P/N Application Optical Parameters
Page
Index
Related manuals
Manual
28 pages
17.41 Kb
Top
Page
Image
Contents