Cisco Systems SFS 3012 manual Update the switch card firmware. Enter the install command

Page 61

43

The keyword all (The CLI defaults to “all” if you enter just “show card”).

Example

Topspin-360#show card 5,9,14,16

============================================================================

Card Information

============================================================================

admin

oper

admin

oper

oper

slot type

type

status

status

code

----------------------------------------------------------------------------

5

en4port1G

en4port1G

up

up

normal

9

fc2port2G

fc2port2G

up

up

normal

14

controller

controller

up

up

normal

16

ib12port4x

ib12port4x

up

up

normal

============================================================================

Card Boot Information

============================================================================

boot

boot

boot

slot stage

status

image

----------------------------------------------------------------------------

5

done

success

TopspinOS-1.1.2/build084

9

done

success

TopspinOS-1.1.2/build084

14

done

success

TopspinOS-1.1.2/build084

16

done

success

TopspinOS-1.1.2/build084

============================================================================

Card Seeprom

============================================================================

product

pca

pca

fru

slot serial-number

serial-number

number

number

----------------------------------------------------------------------------

5

00024

1234

95-00007-01

1234

9

1234

1234

95-00008-01

1234

14

00002

00002

95-00005-01

1234

16

1234

1234

95-00006-01

1234

Topspin-360#

2.Update the switch card firmware. Enter the install command:

Example

Topspin-360#install image:Topspin-360-TopspinOS-2.0.0-build497.img

************************** operation completed successfully Topspin-360#

NOTE: Only cards with an oper-status of “up” are updated. If a card is down when you run install, or a card is added after running install, bring up the card and run install again. Specify the same image file. If the image is already installed on a card, that card is skipped. Run boot-config again so that all cards know to boot off the same system image.

Image 61
Contents Part Number OL-7722-01 Product ID Page Contents Regulatory Notices Vii Install and Boot the Topspin Specifications and Compliance Page Regulatory Notices FCC Statement Safety InformationElectrical Cautions Viii Laser Cautions General CautionsLaser Specs Contact InformationThank YOU for Purchasing Your Topspin Product Product RegistrationXii Standard Product Agreement Xiv Page Xvi Xvii Xviii Introduction Topspin 360 OverviewPerformance FeaturesUnified Fabric Transparent TopologyScalability Redundancy and High-AvailabilityPage Topspin 360 Components Controller Cards Install a Controller Card2Inserting the Controller Card 3Closing the Ejector Lever Replacing and Updating Your Gateways Ethernet and Fibre Channel GatewaysInstall an Ethernet or Fibre Channel Gateway InfiniBand Switch Cards7Inserting a Switch Card Install InfiniBand Switch Cards8Closing Switch Ejector Levers Remove InfiniBand Switch Cards Power Supply Modules10Power Supply Modules Install Power Supply ModulesInstall Blower Trays Removing a Power SupplyBlower Trays Removing Blower Trays Page Page Prepare the Site for the Topspin Install and Boot the TopspinRack the Topspin Install Topspin 360 ComponentsRead the Cautionary Statements Prepare the Physical Environment for Topspin1Positioning the Side Flanges 3Rail Positioning 4Attaching Rails from the Front 5Attaching Rails from the Back 6Positioning the Chassis on the Rails 8Securing the Chassis to the Rails Attach a Serial Console Cable to a PC or TerminalAssign a Static IP Address Boot your Topspin 360 and Configure Basic ConnectivityObtain an IP Address with Dhcp Enter the interface mgmt-ethernet commandConnect InfiniBand Hosts 9Fully Installed IB Cable with Pinch Connector 11Removing a Pinch Connector Manage the Topspin 12Removing a Pull ConnectorView the Software Image Version with the CLI Viewing and Updating the Software Image on the ChassisView the Software Image Version with the GUI An installed image file will have a slash / in the name14View Current Image of an Individual Card Upgrade the Software Image with the CLIUpgrade the Software Image with the GUI 15Copy an Image File to the Switch Delete an Image with the CLI 16Specify the Boot ConfigurationDelete an Image with the GUI Select Maintenance File ManagementPage Expansion Modules Topspin 360 Field Replaceable UnitsConfiguring a New InfiniBand Switch Card Installing an InfiniBand Switch CardUpdate the switch card firmware. Enter the install command Removing an InfiniBand Switch Card Power ModulesInstalling a Power Supply 2Power Supply Module Positioning Replacing Blower Trays Installing a Blower TrayRemoving a Blower Tray Page Topspin 360 LEDs Activity Indication Topspin 360 System LED1Power Supply LEDs Power Supply LEDs2Blower Tray LEDs Blower Tray LEDsLED State Indication Controller Card LEDsIB Port LEDs IB Switch Card LEDsFC Port LEDs Fibre Channel Gateway LEDsEthernet Port LEDs Ethernet Gateway LEDsGeneral Specifications Specifications and ComplianceCertifications/Regulatory Electrical SpecificationsLaser Specs Topspin P/N Application Optical Parameters Page Index
Related manuals
Manual 28 pages 17.41 Kb