Cisco Systems SFS 3012 manual Upgrade the Software Image with the GUI

Page 54

36

NOTE: If you do not have enough available memory to install an additional image, delete an old image. “Delete an Image with the CLI” on page 38.

3.Specify the new boot image to be used.

a.Find the name of your new system image by entering the dir image command. Copy the name of the new image.

b.Enter boot-configprimary-image-source, then paste the copied image file name.

Example

Topspin-360# configure

Topspin-360(config)#boot-config primary-image-source TopspinOS-2.1.0/build497Topspin-360(config)#exit

4.Reboot the chassis. Note: You can also use the card shutdown and card no shutdown commands or the Element Manager GUI to reboot an individual card if you do not need to update the entire chassis.

Example

Topspin-360# reload

5.Save the system configuration. Click Yes when prompted.

6.Use the show card-inventorycommand to view the new primary image for all cards.

Upgrade the Software Image with the GUI

1.Launch the Element Manager GUI.

2.Select Maintenance > File Management. The File Management window appears.

Image 54
Contents Part Number OL-7722-01 Product ID Page Contents Regulatory Notices Vii Install and Boot the Topspin Specifications and Compliance Page FCC Statement Safety Information Regulatory NoticesElectrical Cautions Viii General Cautions Laser CautionsContact Information Laser SpecsProduct Registration Thank YOU for Purchasing Your Topspin ProductXii Standard Product Agreement Xiv Page Xvi Xvii Xviii Topspin 360 Overview IntroductionUnified Fabric FeaturesPerformance Transparent TopologyRedundancy and High-Availability ScalabilityPage Topspin 360 Components Install a Controller Card Controller Cards2Inserting the Controller Card 3Closing the Ejector Lever Ethernet and Fibre Channel Gateways Replacing and Updating Your GatewaysInfiniBand Switch Cards Install an Ethernet or Fibre Channel GatewayInstall InfiniBand Switch Cards 7Inserting a Switch Card8Closing Switch Ejector Levers Power Supply Modules Remove InfiniBand Switch CardsInstall Power Supply Modules 10Power Supply ModulesRemoving a Power Supply Install Blower TraysBlower Trays Removing Blower Trays Page Page Install and Boot the Topspin Prepare the Site for the TopspinRead the Cautionary Statements Install Topspin 360 ComponentsRack the Topspin Prepare the Physical Environment for Topspin1Positioning the Side Flanges 3Rail Positioning 4Attaching Rails from the Front 5Attaching Rails from the Back 6Positioning the Chassis on the Rails Attach a Serial Console Cable to a PC or Terminal 8Securing the Chassis to the RailsBoot your Topspin 360 and Configure Basic Connectivity Assign a Static IP AddressEnter the interface mgmt-ethernet command Obtain an IP Address with DhcpConnect InfiniBand Hosts 9Fully Installed IB Cable with Pinch Connector 11Removing a Pinch Connector 12Removing a Pull Connector Manage the Topspin Viewing and Updating the Software Image on the Chassis View the Software Image Version with the CLIAn installed image file will have a slash / in the name View the Software Image Version with the GUIUpgrade the Software Image with the CLI 14View Current Image of an Individual CardUpgrade the Software Image with the GUI 15Copy an Image File to the Switch 16Specify the Boot Configuration Delete an Image with the CLISelect Maintenance File Management Delete an Image with the GUIPage Topspin 360 Field Replaceable Units Expansion ModulesInstalling an InfiniBand Switch Card Configuring a New InfiniBand Switch CardUpdate the switch card firmware. Enter the install command Power Modules Removing an InfiniBand Switch CardInstalling a Power Supply 2Power Supply Module Positioning Installing a Blower Tray Replacing Blower TraysRemoving a Blower Tray Page Topspin 360 LEDs Topspin 360 System LED Activity IndicationPower Supply LEDs 1Power Supply LEDsBlower Tray LEDs 2Blower Tray LEDsController Card LEDs LED State IndicationIB Switch Card LEDs IB Port LEDsFibre Channel Gateway LEDs FC Port LEDsEthernet Gateway LEDs Ethernet Port LEDsSpecifications and Compliance General SpecificationsElectrical Specifications Certifications/RegulatoryLaser Specs Topspin P/N Application Optical Parameters Page Index
Related manuals
Manual 28 pages 17.41 Kb