Cisco Systems 3560-C manual Verifying Switch Operation, Mounting the Switch

Page 31

Chapter 2 Switch Installation

Verifying Switch Operation

Note You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power input takes precedence.

Catalyst 3560CPD-8PT-S

Connect a 10/100/1000 uplink port to a PoE+ switch, such as a Catalyst 3750-X. Or

Plug the auxiliary power adapter cord into the switch AUX power connector and into an AC power outlet.

Note You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power input takes precedence.

All models (except the Catalyst 2960CPD-8PT-L, 2960CPD-8TT-L, and 3560CPD-8PT-S)

Plug the AC power cord to the switch AC power connector and into an AC power outlet.

Verifying Switch Operation

As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the switch functions properly. LEDs blink during the test, which lasts approximately 1 minute. When the switch begins POST, the System, Status, Duplex, and Speed LEDs turn green. The System LED blinks green, and the other LEDs remain green.

When the POST completes successfully, the System LED turns green. The other LEDs turn off and then reflect the switch operating status. If a switch fails POST, the System LED turns amber.

POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.

After a successful POST, unplug the power cord from the switch. Mount the switch in a rack on a desk or shelf, under a desk or shelf, or on a wall, as described in the “Mounting the Switch” section on page 2-5.

Mounting the Switch

On a Desk or Shelf (without Mounting Screws)

Desk, Shelf, or Wall (with Mounting Screws)

With a Mounting Tray

In a Rack

On a DIN Rail

Catalyst 3560-C and 2960-C Switch Hardware Installation Guide

 

OL-23803-02

2-5

 

 

 

Image 31
Contents Text Part Number OL-23803-02 Americas HeadquartersPage N T E N T S Switch Installation Switch LEDs OL-23803-02 Preface Related Publications Obtaining Documentation and Submitting a Service RequestSwitch Model Description Switch ModelsFront Panel 3 4 Catalyst 3560CPD-8PT-S Front Panel View 10/100 and 10/100/1000 Fast Ethernet Downlink Ports PoE Ports Switches with PoE PortsPoE Pass-Through PoE Pass-Through PoE Budgeting for the Catalyst 2960CPD-8PT-L GLC-FE-100FX= GLC-FE-100LX= GLC-FE-100BX-D= USB Type a PortDual-Purpose Ports SFP ModulesUSB Mini-Type B Port Management PortsLEDs Switch Panel LEDsColor Description System LEDConsole LEDs Color System StatusPort LEDs Port Mode DescriptionPort status Port status. This is the default mode Modes for Port LEDsDual-Purpose Port LEDs PoE LEDColor Meaning Rear Panel Security slot Power adapter connector Reset buttonAuxiliary Power Adapter Internal Power SupplyAuxiliary power adapter Management Options Reset ButtonSecurity Slots Cisco IOS CLI Network ConfigurationsPreparing for Installation Switch InstallationStatement Installation Guidelines Box Contents Powering the SwitchEquipment That You Supply Mounting the Switch Verifying Switch OperationDesk, Shelf, or Wall with Mounting Screws On a Desk or Shelf without Mounting ScrewsDesk- or Shelf-Mounting Installing the Mounting Screws on Top of a Desk or a Shelf Under the Desk- or Shelf-Mounting Mounting the Switch on Top of a Desk or ShelfDesk or shelf Screws Screw template Adhesive Installing the Mounting Screws Under a Desk or ShelfDesk or shelf Slides on this way Wall-MountingLocation of the Mounting Holes on the Switch 77 in .49 cm 72 in .44 cm 46. 62 in .19 cm SwitchInstalling the Mounting Screws on the Wall Mounting Tray with Screws With a Mounting TrayInstalling the Switch on the Mounting Tray Switch Mounting tray Sliding direction DeskMounting Tray with a Magnet Switch Number-10 Phillips pan-head screws11 Placing the Switch on the Mounting Tray Place the switch on the mounting tray. See Figure13 Wall-Mounting with a Magnet A Rack Attaching Brackets to the SwitchPhillips flat-head screw 15 Attaching the 23-inch Brackets for Rack-Mounting Mounting the Switch in a RackOn a DIN Rail Attaching the DIN-Mount Tray to the SwitchPlace the switch on the DIN rail mount. See Figure Switch DIN rail mount18 Securing the DIN-Mount Tray to the Switch Mounting the Switch on a DIN Rail19 Mounting the Switch on a DIN Rail Removing the Switch from a DIN Rail Switch Reset button cover Installing a Cover for the Reset Button Optional23 Inserting the Retainer through the Lanced Loop Installing the Power Cord Retainer OptionalSlide the retainer through the first latch. See Figure AC power cord Latches Sleeve for thin power cords26 Sleeve Around the Power Cord Washer Installing the Cable Guard Optional29 Attaching the Cable Guard to the Switch 31 Attaching the Cables to the Switch Installing SFP Modules After Installing the SwitchNumber-8 Phillips wood screws Desk or shelf Grasp the SFP module, and carefully remove it from the slot Removing SFP ModulesTX and which is receive RX Insert a dust plug into the optical ports of the SFP moduleConnecting to the 10/100 and 10/100/1000 Ports Connecting Devices to the Ethernet PortsBale clasp Device Crossover Cable Connecting to the PoE PortsWhere to Go Next OL-23803-02 Switch Post Results Diagnosing ProblemsEthernet and Fiber-Optic Cables Switch LEDsSwitch Connections Bad or Damaged CableSFP Module Interface Settings10/100 and 10/100/1000 Port Connections 10/100 PoE or PoE+ Port ConnectionsAutonegotiation and Network Interface Cards Switch PerformanceSpanning Tree Loops Speed, Duplex, and AutonegotiationFinding the Switch Serial Number Resetting the SwitchSerial Number Location for the Catalyst 3560CPD-8PT-S Switch 330039 OL-23803-02 Environmental Ranges Technical SpecificationsEnvironmental Ranges Physical Specifications Power Requirements Table A-2 Catalyst 3560-C and 2960-C Switch Specifications Available PoE SwitchOL-23803-02 10/100 and 10/100/1000 Ports Connector SpecificationsFigure B-2 10/100/1000 Port Pinouts SFP Module ConnectorsSFP Module Cables Cables and AdaptersCore Modal Wavelength TP3 Cable PinoutsConsole Port Adapter Pinouts Switch Console RJ-45-to-DB-9 Port DTEDevice TxD RxD Switch Console RJ-45-to-DB-25 Port DTE Adapter DeviceRxD TxD RJ-45 Console Port Accessing the CLI Through the Console PortFigure C-1 Connecting the Console Cable USB Mini-Type B Console Port Figure C-2 Connecting the USB-Mini Console CableInstalling the Cisco Microsoft Windows XP USB Driver Installing the Cisco Microsoft Windows USB Device DriversInstalling the Cisco Microsoft Windows 2000 USB Driver Using the Add or Remove Programs Utility Uninstalling the Cisco Microsoft Windows USB DriversIP Settings Entering the Initial Configuration InformationCompleting the Setup Program Switch or as a standalone switch Enter an enable secret password, and press ReturnEnter an enable password, and press Return Enter a virtual terminal Telnet password, and press ReturnThese choices appear OL-23803-02