Cisco Systems AS5350XM manual Safety Recommendations, Maintaining Safety with Electricity

Page 27

C H A P T E R 2

Preparing to Install the Cisco AS5350XM

Universal Gateway

This chapter describes the tasks you must perform before you begin to install the Cisco AS5350XM universal gateway and includes the following sections:

Safety Recommendations, page 2-1

Required Tools and Equipment, page 2-3

Preparing to Connect to a Network, page 2-3

Safety Recommendations

Any device that uses electricity must be handled carefully; follow these guidelines to ensure general safety:

Keep the chassis area clear and dust-free during and after installation.

Put the removed chassis cover in a safe place.

Keep tools away from walk areas where you and others could fall over them.

Do not wear loose clothing that could get caught in the chassis. Fasten your tie or scarf and roll up your sleeves.

Wear safety glasses if you are working under any conditions that might be hazardous to your eyes.

Do not perform any action that creates a potential hazard to people or makes the equipment unsafe.

Warning Ultimate disposal of this product should be handled according to all national laws and regulations. Statement 1040

Maintaining Safety with Electricity

Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals. Statement 43

Follow these guidelines when you work on equipment powered by electricity.

Cisco AS5350XM Universal Gateway Chassis Installation Guide

 

OL-6417-02

2-1

 

 

 

Image 27
Contents Cisco AS5350XM Universal Gateway Chassis Installation Guide Cisco AS5350XM Universal Gateway Chassis Installation Guide Iii N T E N T SInstalling the Cisco AS5350XM Universal Gateway Overview B-1 OL-6417-02 Vii Document OrganizationViii Document ConventionsBewaar Deze Instructies Bewahren SIE Diese Hinweise GUT AUF Spara Dessa Anvisningar Xii GEM Disse AnvisningerXiii Xiv Obtaining DocumentationCisco.com Product Documentation DVDOrdering Documentation Documentation FeedbackReporting Security Problems in Cisco Products Cisco Product Security OverviewXvi Xvii Submitting a Service RequestObtaining Technical Assistance Cisco Technical Support & Documentation WebsiteDefinitions of Service Request Severity Obtaining Additional Publications and InformationXviii Xix OL-6417-02 Chassis Components OverviewCisco AS5350XM Universal Gateway Front Panel Product Serial Number LocationCisco Product Identification Tool Dial Feature Cards DFCsChassis Specifications Power SupplySee the Regulatory Compliance and Safety OL-6417-02 Maintaining Safety with Electricity Safety RecommendationsPreventing Electrostatic Discharge Damage Preparing to Connect to a Network Required Tools and EquipmentConsole and Auxiliary Ports Ethernet ConnectionsAlarm Port 2T Serial PortsBits Port Power Supply Considerations Setting Up the Chassis Installing the Cisco AS5350XM Universal GatewayAttaching the Rubber Feet Setting the Chassis on a DesktopAttaching the Rubber Feet Rack-Mounting the ChassisRequired Tools and Equipment Installing in a Rack Connecting to an Ethernet Network Connecting to the NetworkConnecting to an Ethernet Hub 10/100BASE-T Shown Connecting to a WANConnecting a 2-Port or 4-Port DFC to an RJ-45 T1 Jack Connecting a 2-Port or 4-Port DFC to an RJ-45 Jack 10 Connecting an 8-Port DFC to an RJ-45 Jack Connecting to the Console Port Connecting to the Console and Auxiliary PortsConnecting a Modem to the Auxiliary Port Connecting a Signal Generator to the Bits PortSupplying Power Connecting an Alarm to the Alarm PortConnecting the AC Power Cord 16 Connecting the AC Power Cord Wiring the DC Power Supply18 DC Power Supply Connections-Single Power Supply 19 DC Power Supply Connections-Redundant Power Supply Where to Go Next LEDs TroubleshootingLED Monitoring the EnvironmentCisco AS5350XM Universal Gateway Slot Numbering Displaying the Environment StatusPower Supply Troubleshooting Network Interfaces Replacing the Fan TrayRemoving the Fan Tray Cisco AS5350XM Front Panel Pulling the Edge of the Fan Tray Slide Metal Tabs out of the Slots Installing the Fan TrayInserting the Metal Tabs into the Slots 10 Tightening Fan Tray Screws Getting HelpSafety Recommendations Removing the Chassis CoverRequired Tools Chassis Cover Removal Figure A-1 Removing the Chassis Cover Screws Replacing the Compact Flash AUX CON GE1 GE0 Replacing DIMMs Required Tools and EquipmentReplacing the Dimm Figure A-4 Removing and Replacing the Dimm Medium Phillips screwdriver Five screws Replacing the Chassis CoverFigure A-6 Replacing the Chassis Cover Chassis Cover ReplacementFigure A-7 Cisco AS5350XM Chassis Overview Replacing the Power SupplyRequired Tools and Equipment Figure B-1 DC Power Supply Connections-Single Power Supply To DC source DC connector Figure B-3 Removing the Chassis Cover Screws Removing the Old Power Supply Figure B-7 Removing the Air Separator Figure B-8 Power Supply Connectors Figure B-10 Lifting the Power Supply Out of the Chassis Installing the Power SupplyFigure B-11 Inserting the Power Supply in the Chassis Figure B-13 Replacing the Air Separator Secure the chassis cover with five screws Connect the DC connector to the rear of the power supply To DC source DC connector Page OL-6417-02 Console and Auxiliary Port Cables and Pinouts Cabling SpecificationsConsole Port Cables and Pinouts Identifying a Rollover CableRJ-45-to-DB-9 Auxiliary Port Cables and Pinouts Ethernet Port PinoutsAlarm Port Pinouts Bits Port PinoutsBantam Jack Port Pinouts OL-6417-02 IN-1 NumericsIN-2 WANIN-3 IN-4 IN-5 IN-6
Related manuals
Manual 104 pages 52.67 Kb Manual 6 pages 52.67 Kb