Chapter 3 Installing the GSS
Unpacking and Inspecting the GSS
Unpacking and Inspecting the GSS
The GSS shipment contains the following items:
•One
•Two
•One
•One
•One
•Four rubber feet
•Cisco Product Documentation
•Cisco Global Site Selector 4491 Hardware Installation Guide
•Regulatory Compliance and Safety Information for the Cisco Global Site Selector 4491
The GSS is shipped in a protective shipping carton. It is shipped as a
Follow these steps to unpack the GSS:
1.Remove the GSS accessories from the shipping carton. Save the packing materials in case you need to repack the GSS later.
2.Check the configuration of the GSS and the accessories against the items listed on the packing slip. Report any discrepancies as described in “If the Product is Damaged”.
3.Before installing the GSS, review the information outlined in Chapter 2, Preparing for Installation.
If the Product is Damaged
If any portion of the unit or component is damaged in transit, forward an immediate request to the delivering carrier to perform an inspection of the product and to prepare a damage report. Save the container and all packing materials until the contents are verified.
| Cisco Global Site Selector 4491 Hardware Installation Guide |