Chapter 2 Preparing to Install the Router
General Site Requirements
General Site Requirements
This section describes the requirements your site must meet for safe installation and operation of your router. Ensure that the site is properly prepared before beginning installation. If you are experiencing shutdowns or unusually high errors with your existing equipment, this section can also help you isolate the cause of failures and prevent future problems.
Power Supply Considerations
Check the power at your site to ensure that you are receiving “clean” power (free of spikes and noise). Install a power conditioner if necessary.
Warning The device is designed for connection to TN and IT power systems. Statement 1007
The AC power supply includes the following features:
•Autoselects either
•All units include a
Table
Table
|
| Input Voltage | |
Power Source | Input Power | Tolerance Limits | |
|
|
|
|
AC | 100 - 240 VAC, 1.0 A, 50 - 60 Hz | 85 | - 264 VAC |
|
|
|
|
DC | 48 - 60 VDC, 3.0 A | 38 | - 72 VDC |
|
|
|
|
Site Environment
The router can be placed on a desktop or mounted in a rack. Single
When planning your site layout and equipment locations, remember the precautions described in the next section, “Site Configuration,” to help avoid equipment failures and reduce the possibility of environmentally caused shutdowns. If you are currently experiencing shutdowns or unusually high errors with your existing equipment, these precautions may help you isolate the cause of the failures and prevent future problems.