Chapter 2 Preparing to Install the Router
Inspecting the Router
–Maintenance schedules and requirements
–Maintenance procedures performed
–Intermittent problems
–Comments and notes
Inspecting the Router
Do not unpack the router until you are ready to install it. If the final installation site will not be ready for some time, keep the chassis in its shipping container to prevent accidental damage. When you are ready to install the router, proceed with unpacking it.
The router, cables, publications, and any optional equipment you ordered may be shipped in more than one container. When you unpack the containers, check the packing list to ensure that you received all the following items:
•Router
•
•Rubber feet for desktop mounting (with routers of 1
•
•
•Grounding lug and bracket
•
•
•Ethernet cable
•Optional equipment (such as network connection cables or additional
•Cisco 2600 Series Modular Routers Quick Start Guide
•Cisco 2600 Series, Cisco 3600 Series, and Cisco 3700 Series Regulatory Compliance and Safety Information document
Inspect all items for shipping damage. If anything appears to be damaged, or if you encounter problems installing or configuring your router, contact customer service. Warranty, service, and support information is in the quick start guide that shipped with your router.
Tools and Equipment for Installation and Maintenance
You need the following tools and equipment to install and upgrade the router and its components:
•
•Number 2 Phillips screwdriver
•
–To install or remove modules
–To remove the cover or mainboard tray, if you are upgrading memory or other components
•
•ROM
Cisco 2600 Series Routers Hardware Installation Guide
| ||
|