INSTALLATION
To attach a UTP or STP lobe segment to a TRXI network port:
1.Insert the RJ45 connector from each twisted pair segment into the desired RJ45 network lobe port number on the TRXI as shown in Figure
18
6
17
5
16
4
15
3
14
2
13
1
RO
LNK
TPIM-T4
LNK
RI
Figure 3-10. TRXI Network Ports
2.The associated Port Status LED will light green when the station boots up. If the LED is not lit, perform each of the following steps until it is:
a.Check that the device at the other end of the twisted pair segment is on and the network interface driver is initialized.
b.Verify that the RJ45 connector on the twisted pair segment has the proper pinouts.
c.Check the cable for continuity.
d.Check that the twisted pair connection meets dB loss and cable specifications outlined in Chapter 2.
e.Check Local Management to ensure the port is enabled.
If a link still has not been established, contact Cabletron Systems Technical Support.