Cabletron Systems SEH-24, SEH-32, SEH-34 manual Installation REQUIREMENTS/SPECIFICATIONS

Page 17

INSTALLATION REQUIREMENTS/SPECIFICATIONS

2.1.4Single Mode Fiber Optic Cable Specifications for the EPIM-F3 Module

Table 2-2 shows Single Mode Fiber Optic Cable specifications for the EPIM-F3.

Table 2-2. Single Mode Fiber Optic Cable Specifications

Cable Type

Attenuation

Maximum Cable Length

 

 

 

 

 

 

8/125-12/125 ∝m

10.0 dB or less

The maximum allowable fiber

 

 

optic cable length is

 

 

5 km (3.1 miles) with bridges

 

 

at each segment end. Howev-

 

 

er, IEEE 802.3 FOIRL specifi-

 

 

cations specify a maximum of

 

 

1 km (1093.6 yards).

 

 

 

Attenuation

You must test the fiber optic cable with a fiber optic attenuation test set adjusted for an 1300 nm wavelength. This test verifies that the signal loss in a cable is 10.0 dB or less for any given single mode fiber optic link.

Fiber Optic Budget and Propagation Delay

Fiber optic budget is the combination of the optical loss due to the fiber optic cable, in-line splices, and fiber optic connectors. When determining the maximum fiber optic cable length, the fiber optic budget (total loss of 10.0 dB or less between stations) and total network propagation delay should be calculated and considered before fiber optic cable runs are incorporated in any network design.

Propagation delay is the amount of time it takes data to travel from the sending device to the receiving device. Total propagation delay allowed for the entire network is 25.6 ∝sec, if the total propagation delay between any two nodes on the network exceeds 25.6 ∝sec, then bridges should be used.

Page 2-5

Image 17
Contents 10BASE-T Stackable HUB USER’S Guide Printed On Recycled Paper DOC Notice FCC NoticeCabletron Software Program License Cabletron SYSTEMS, INC Program License AgreementUnited States Government Restricted Rights Exclusion of Warranty Disclaimer of LiabilityTable of Contents Connecting to the Network Contents InstallationTroubleshooting Appendix B Twisted Pair Wiring Tables A-1Chapter Introduction Using this ManualSEH Overview Introduction Getting HelpPolarity Detection and Correction SEH FeaturesRepeater Functionality Epim Optional FeaturesStackable Capabilities HubSTACK Interconnect Cables Daughter Board Upgrade KitPart Description Application Number Rack Mount or Wall Mount HardwareHubSTACK Interconnect Cable Requirements Cable SpecificationsInsertion Loss LengthImpedance JitterTemperature DelayCrosstalk NoiseCable Type Attenuation Maximum Cable Length Fiber Optic Budget and Propagation DelayInstallation REQUIREMENTS/SPECIFICATIONS Thin-net Network Requirements for the EPIM-C Module ConnectorsCable Type TerminatorsAUI Cable Network Port SpecificationsAUI Cable Requirements for the EPIM-A and EPIM-X Modules SEH-32 and SEH-34 Network Port Specifications SEH-22 and SEH-24 Network Port SpecificationsPin Champ Connector EPIM-T Installation REQUIREMENTS/SPECIFICATIONS Epim SpecificationsParameter Typical Worst Worst Case Typical Value Budget EPIM-F1/F2EPIM-F3 EPIM-F3Parameter Typical Minimum Maximum EPIM-C Connector TypeEPIM-A and EPIM-X EPIM-A and EPIM-X AUI PortDelay Times Start of Packets Operating SpecificationsDelay Times JAM GeneralPower Supply Requirements Fault ProtectionOutput Min. Load Max. Load Max Power JAM OutputPhysical SafetyUnpacking the SEH Installing the SEHStacking the SEH SEH-2410BASE-T HUB with Lanview Disconnect SEH and Sehi Interconnect Cables At the OUT Port Attaching the Strain Relief BracketRack Mounting the SEH Installing the SEH in the RackWall Mounting the SEH Shelf or Table-top Installation Free-Standing InstallationInstallation Connecting the SEH to the Power Source Connecting Network Ports SEH-22 and SEH-24 Connecting the SEH to the NetworkEPIM-2 Connecting Network Ports SEH-32 and SEH-34 EPIM-T Cross-over Switch Connecting a UTP Segment to an EPIM-TConnecting to the Network Connecting to the Network Connecting to the Network Connecting a Thin-Net Segment to an EPIM-C EPIM-C EPIM-A Connecting an AUI Cable to an EPIM-AConnecting an AUI Cable to an EPIM-X On Position Toward Back Epim OFF Position Toward Front Finishing the InstallationInstallation CHECK-OUT Chapter TroubleshootingUsing Lanview Mgmt Green Flashing PWR GreenLNK Green CLN RedRCV Yellow Flashing Twisted Pair Wiring Tables Appendix a Twisted Pair Wiring TablesA-2 A-3 A-4 Drop Device From Punch Down To RJ-45 Into Block Wallplate Office10BASE-T A-6 A-7 Champ Down Block If Required Ethernet Device SEH-32/34 Punch Wall PlateFigure A-1. Punch Down Block A-9 German Power Supply CordSpanish French