INSTALLATION
To stack SEHs together, refer to Figure
1.Attach the SEH HubSTACK Interconnect cable to the bus port labeled “OUT” on the rear panel of the SEH.
2.Attach the other end of SEH HubSTACK Interconnect cable to the bus port labeled “IN” on the rear panel of the SEH next in the stack.
3.Attach up to four SEH hubs in the stack repeating steps 1 and 2.
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT SEH INTERCONNECT IN
OUT SEH INTERCONNECT IN
OUT SEH INTERCONNECT IN
OUT SEH INTERCONNECT IN
OUT SEH INTERCONNECT IN
OUT SEH INTERCONNECT IN
OUT SEH INTERCONNECT IN
OUT SEH INTERCONNECT IN
OUT SEH INTERCONNECT IN
SEH INTERCONNECT
OUT
Figure 3-1. Stacking the SEH
To stack an SEH to an SEHI, refer to Figure 3-1 and perform the following steps:
1.Attach the SEHI HubSTACK Interconnect cable to the bus port labeled “OUT” on the rear panel of the SEHI.
2.Attach the other end of SEHI HubSTACK Interconnect cable to the bus port labeled “IN” on the rear panel of the SEH next in the stack.
Page