Cabletron Systems SEH-24, SEH-32, SEH-34 manual Installation Connecting the SEH to the Power Source

Page 38

INSTALLATION

3.3CONNECTING THE SEH TO THE POWER SOURCE

Note: The SEH has a universal power supply. This allows you to connect the SEH to power sources from 90 Vac to 264 Vac, 47-63 Hz.

To connect the SEH to the power source:

1.Plug the power cord into the back panel of the SEH.

2.Plug the other end of the power cord into a grounded wall outlet.

3.Verify that the PWR LED is on, this indicates that the SEH is receiving power.

Page 3-8

Image 38
Contents 10BASE-T Stackable HUB USER’S Guide Printed On Recycled Paper FCC Notice DOC NoticeCabletron SYSTEMS, INC Program License Agreement Cabletron Software Program LicenseExclusion of Warranty Disclaimer of Liability United States Government Restricted RightsTable of Contents Troubleshooting Contents InstallationConnecting to the Network Appendix B Twisted Pair Wiring Tables A-1Using this Manual Chapter IntroductionIntroduction Getting Help SEH OverviewPolarity Detection and Correction SEH FeaturesRepeater Functionality Epim Optional FeaturesStackable Capabilities Part Description Application Number Daughter Board Upgrade KitHubSTACK Interconnect Cables Rack Mount or Wall Mount HardwareCable Specifications HubSTACK Interconnect Cable RequirementsImpedance LengthInsertion Loss JitterCrosstalk DelayTemperature NoiseFiber Optic Budget and Propagation Delay Cable Type Attenuation Maximum Cable LengthInstallation REQUIREMENTS/SPECIFICATIONS Cable Type ConnectorsThin-net Network Requirements for the EPIM-C Module TerminatorsAUI Cable Network Port SpecificationsAUI Cable Requirements for the EPIM-A and EPIM-X Modules SEH-22 and SEH-24 Network Port Specifications SEH-32 and SEH-34 Network Port SpecificationsPin Champ Connector Installation REQUIREMENTS/SPECIFICATIONS Epim Specifications EPIM-TEPIM-F1/F2 Parameter Typical Worst Worst Case Typical Value BudgetEPIM-F3 EPIM-F3Parameter Typical Minimum Maximum Connector Type EPIM-CEPIM-A and EPIM-X AUI Port EPIM-A and EPIM-XDelay Times JAM Operating SpecificationsDelay Times Start of Packets GeneralOutput Min. Load Max. Load Max Power Fault ProtectionPower Supply Requirements JAM OutputSafety PhysicalInstalling the SEH Unpacking the SEHStacking the SEH SEH-2410BASE-T HUB with Lanview Attaching the Strain Relief Bracket Disconnect SEH and Sehi Interconnect Cables At the OUT Port Installing the SEH in the Rack Rack Mounting the SEHWall Mounting the SEH Free-Standing Installation Shelf or Table-top InstallationInstallation Connecting the SEH to the Power Source Connecting the SEH to the Network Connecting Network Ports SEH-22 and SEH-24EPIM-2 Connecting Network Ports SEH-32 and SEH-34 Connecting a UTP Segment to an EPIM-T EPIM-T Cross-over SwitchConnecting to the Network Connecting to the Network Connecting to the Network Connecting a Thin-Net Segment to an EPIM-C EPIM-C Connecting an AUI Cable to an EPIM-A EPIM-AConnecting an AUI Cable to an EPIM-X Finishing the Installation On Position Toward Back Epim OFF Position Toward FrontChapter Troubleshooting Installation CHECK-OUTUsing Lanview PWR Green Mgmt Green FlashingLNK Green CLN RedRCV Yellow Flashing Appendix a Twisted Pair Wiring Tables Twisted Pair Wiring TablesA-2 A-3 A-4 Drop Device From Punch Down To RJ-45 Into Block Wallplate Office10BASE-T A-6 A-7 SEH-32/34 Punch Wall Plate Champ Down Block If Required Ethernet DeviceFigure A-1. Punch Down Block A-9 Spanish Power Supply CordGerman French