Cabletron Systems SEH-32, SEH-34 Connecting a UTP Segment to an EPIM-T, EPIM-T Cross-over Switch

Page 42

CONNECTING TO THE NETWORK

4.Check that the link LED on the 10BASE-T Ethernet device and the applicable LNK LED on the SEH are on. If the LEDs are not on, perform each of the following steps until the LEDs are on:

a.Check that the 10BASE-T device and the SEH have power.

b.Verify the cabling between the SEH and the 10BASE-T device.

c.Check the cable for continuity.

If a link has not been established, contact Cabletron Systems Technical Support.

4.1.3Connecting a UTP Segment to an EPIM-T

Before connecting a segment to the EPIM-T, check each end of the segment to determine if the wires have been crossed-over for the proper connection. If the wires do not cross over, use the switch on the EPIM-T to internally cross over the RJ45 port. Refer to Figure 4-3 to properly set the EPIM-T cross-over switch.

Position X (crossed over)

1. RX+

5. NC

2. RX-

6. TX-

3. TX+

7. NC

4. NC

8. NC

Position =

(not crossed over)

1. TX+

5.

NC

2. TX-

6.

RX-

3. RX+

7. NC

4. NC

8. NC

Figure 4-3. EPIM-T Cross-over Switch

Page 4-4

Image 42
Contents 10BASE-T Stackable HUB USER’S Guide Printed On Recycled Paper FCC Notice DOC NoticeCabletron SYSTEMS, INC Program License Agreement Cabletron Software Program LicenseExclusion of Warranty Disclaimer of Liability United States Government Restricted RightsTable of Contents Troubleshooting Contents InstallationConnecting to the Network Appendix B Twisted Pair Wiring Tables A-1Using this Manual Chapter IntroductionIntroduction Getting Help SEH OverviewSEH Features Repeater FunctionalityPolarity Detection and Correction Optional Features Stackable CapabilitiesEpim Part Description Application Number Daughter Board Upgrade KitHubSTACK Interconnect Cables Rack Mount or Wall Mount HardwareCable Specifications HubSTACK Interconnect Cable RequirementsImpedance LengthInsertion Loss JitterCrosstalk DelayTemperature NoiseFiber Optic Budget and Propagation Delay Cable Type Attenuation Maximum Cable LengthInstallation REQUIREMENTS/SPECIFICATIONS Cable Type ConnectorsThin-net Network Requirements for the EPIM-C Module TerminatorsNetwork Port Specifications AUI Cable Requirements for the EPIM-A and EPIM-X ModulesAUI Cable SEH-22 and SEH-24 Network Port Specifications SEH-32 and SEH-34 Network Port SpecificationsPin Champ Connector Installation REQUIREMENTS/SPECIFICATIONS Epim Specifications EPIM-TEPIM-F1/F2 Parameter Typical Worst Worst Case Typical Value BudgetEPIM-F3 EPIM-F3Parameter Typical Minimum Maximum Connector Type EPIM-CEPIM-A and EPIM-X AUI Port EPIM-A and EPIM-XDelay Times JAM Operating SpecificationsDelay Times Start of Packets GeneralOutput Min. Load Max. Load Max Power Fault ProtectionPower Supply Requirements JAM OutputSafety PhysicalInstalling the SEH Unpacking the SEHStacking the SEH SEH-2410BASE-T HUB with Lanview Attaching the Strain Relief Bracket Disconnect SEH and Sehi Interconnect Cables At the OUT PortInstalling the SEH in the Rack Rack Mounting the SEHWall Mounting the SEH Free-Standing Installation Shelf or Table-top InstallationInstallation Connecting the SEH to the Power Source Connecting the SEH to the Network Connecting Network Ports SEH-22 and SEH-24EPIM-2 Connecting Network Ports SEH-32 and SEH-34 Connecting a UTP Segment to an EPIM-T EPIM-T Cross-over SwitchConnecting to the Network Connecting to the Network Connecting to the Network Connecting a Thin-Net Segment to an EPIM-C EPIM-C Connecting an AUI Cable to an EPIM-A EPIM-AConnecting an AUI Cable to an EPIM-X Finishing the Installation On Position Toward Back Epim OFF Position Toward FrontChapter Troubleshooting Installation CHECK-OUTUsing Lanview PWR Green Mgmt Green FlashingCLN Red RCV Yellow FlashingLNK Green Appendix a Twisted Pair Wiring Tables Twisted Pair Wiring TablesA-2 A-3 A-4 From Punch Down To RJ-45 Into Block Wallplate Office 10BASE-TDrop Device A-6 A-7 SEH-32/34 Punch Wall Plate Champ Down Block If Required Ethernet DeviceFigure A-1. Punch Down Block A-9 Spanish Power Supply CordGerman French