Cabletron Systems SEH-34, SEH-32, SEH-24 manual Using Lanview

Page 52

TROUBLESHOOTING

2.If the remote station is ready and the LNK LED is on, but no data passes through the port, one of two conditions may exist:

Network management has disabled the port.

The port is segmented either because the collision detector was on for more than 110 ∝sec. or the SEH detected more than 32 consecutive collisions on the attached segment. The affected port remains segmented until a good packet is transmitted/ received without collisions.

If the LNK LED is still not on, contact Cabletron Systems Technical Support.

5.2USING LANVIEW

The SEH incorporates the Cabletron Systems LANVIEW Status Monitoring and Diagnostics System. LANVIEW LEDs can help diagnose problems such as a power failure or a cable fault. The SEH includes the following LANVIEW LEDs:

PWR, for power status

MGMT, for management status

RCV (Receive), LNK (Link), and CLN (Collision) for Ethernet status.

Figure 5-1 provides a quick reference chart of LED locations and definitions. This chapter also includes a detailed description of each LED.

Page 5-2

Image 52
Contents 10BASE-T Stackable HUB USER’S Guide Printed On Recycled Paper FCC Notice DOC NoticeCabletron SYSTEMS, INC Program License Agreement Cabletron Software Program LicenseExclusion of Warranty Disclaimer of Liability United States Government Restricted RightsTable of Contents Contents Installation Connecting to the NetworkTroubleshooting Appendix B Twisted Pair Wiring Tables A-1Using this Manual Chapter IntroductionIntroduction Getting Help SEH OverviewRepeater Functionality SEH FeaturesPolarity Detection and Correction Stackable Capabilities Optional FeaturesEpim Daughter Board Upgrade Kit HubSTACK Interconnect CablesPart Description Application Number Rack Mount or Wall Mount HardwareCable Specifications HubSTACK Interconnect Cable RequirementsLength Insertion LossImpedance JitterDelay TemperatureCrosstalk NoiseFiber Optic Budget and Propagation Delay Cable Type Attenuation Maximum Cable LengthInstallation REQUIREMENTS/SPECIFICATIONS Connectors Thin-net Network Requirements for the EPIM-C ModuleCable Type TerminatorsAUI Cable Requirements for the EPIM-A and EPIM-X Modules Network Port SpecificationsAUI Cable SEH-22 and SEH-24 Network Port Specifications SEH-32 and SEH-34 Network Port SpecificationsPin Champ Connector Installation REQUIREMENTS/SPECIFICATIONS Epim Specifications EPIM-TEPIM-F1/F2 Parameter Typical Worst Worst Case Typical Value BudgetEPIM-F3 EPIM-F3Parameter Typical Minimum Maximum Connector Type EPIM-CEPIM-A and EPIM-X AUI Port EPIM-A and EPIM-XOperating Specifications Delay Times Start of PacketsDelay Times JAM GeneralFault Protection Power Supply RequirementsOutput Min. Load Max. Load Max Power JAM OutputSafety PhysicalInstalling the SEH Unpacking the SEHStacking the SEH SEH-2410BASE-T HUB with Lanview Attaching the Strain Relief Bracket Disconnect SEH and Sehi Interconnect Cables At the OUT PortInstalling the SEH in the Rack Rack Mounting the SEHWall Mounting the SEH Free-Standing Installation Shelf or Table-top InstallationInstallation Connecting the SEH to the Power Source Connecting the SEH to the Network Connecting Network Ports SEH-22 and SEH-24EPIM-2 Connecting Network Ports SEH-32 and SEH-34 Connecting a UTP Segment to an EPIM-T EPIM-T Cross-over SwitchConnecting to the Network Connecting to the Network Connecting to the Network Connecting a Thin-Net Segment to an EPIM-C EPIM-C Connecting an AUI Cable to an EPIM-A EPIM-AConnecting an AUI Cable to an EPIM-X Finishing the Installation On Position Toward Back Epim OFF Position Toward FrontChapter Troubleshooting Installation CHECK-OUTUsing Lanview PWR Green Mgmt Green FlashingRCV Yellow Flashing CLN RedLNK Green Appendix a Twisted Pair Wiring Tables Twisted Pair Wiring TablesA-2 A-3 A-4 10BASE-T From Punch Down To RJ-45 Into Block Wallplate OfficeDrop Device A-6 A-7 SEH-32/34 Punch Wall Plate Champ Down Block If Required Ethernet DeviceFigure A-1. Punch Down Block A-9 Power Supply Cord GermanSpanish French