CONTENTS
CHAPTER 3 INSTALLATION |
| ||
3.1 | UNPACKING THE SEH | ||
3.2 | INSTALLING THE SEH | ||
| 3.2.1 | Stacking the SEH | |
| 3.2.2 Attaching the Strain Relief Bracket | ||
| 3.2.3 Rack Mounting the SEH | ||
| 3.2.4 Wall Mounting the SEH | ||
| 3.2.5 | ||
3.3 | CONNECTING THE SEH TO THE POWER SOURCE | ||
CHAPTER 4 CONNECTING TO THE NETWORK |
| ||
4.1 | CONNECTING THE SEH TO THE NETWORK | ||
| 4.1.1 Connecting Network Ports | ||
| 4.1.2 Connecting Network Ports | ||
| 4.1.3 Connecting a UTP Segment to an | ||
| 4.1.4 Connecting a Fiber Optic Link Segment to an | ||
|
| ||
| 4.1.5 Connecting a | ||
| 4.1.6 Connecting an AUI Cable to an | ||
| 4.1.7 Connecting an AUI Cable to an | ||
4.2 | FINISHING THE INSTALLATION | ||
CHAPTER 5 TROUBLESHOOTING |
| ||
5.1 | INSTALLATION | ||
5.2 | USING LANVIEW |
APPENDIX B TWISTED PAIR WIRING TABLES A-1
vi