Cabletron Systems SEH-34 Installation REQUIREMENTS/SPECIFICATIONS Epim Specifications, Epim-T

Page 22

INSTALLATION REQUIREMENTS/SPECIFICATIONS

2.3EPIM SPECIFICATIONS

EPIMs let you connect the SEH to the main network using different media types. Cabletron Systems offers a variety of EPIMs. The following sections explain specifications for each EPIM.

2.3.1EPIM-T

The EPIM-T is an RJ45 connector supporting UTP cabling. It has an internal Cabletron Systems TPT-T™ 10BASE-T Twisted Pair Transceiver.

The slide switch on the EPIM-T determines the cross-over status of the cable pairs. If the switch is on the X side, the pairs are internally crossed over. If the switch is on the = side, the pairs are not internally crossed over. Figure 2-3 shows the pinouts for the EPIM-T in both cross-over positions.

Position X (crossed over)

1. RX+

5. NC

2. RX-

6. TX-

3. TX+

7. NC

4. NC

8. NC

 

 

Position = (not crossed over)

1. TX+

5.

NC

2. TX-

6.

RX-

3. RX+

7. NC

4. NC

8. NC

Figure 2-3. EPIM-T Pinouts

Page 2-10

Image 22
Contents 10BASE-T Stackable HUB USER’S Guide Printed On Recycled Paper FCC Notice DOC NoticeCabletron SYSTEMS, INC Program License Agreement Cabletron Software Program LicenseExclusion of Warranty Disclaimer of Liability United States Government Restricted RightsTable of Contents Troubleshooting Contents InstallationConnecting to the Network Appendix B Twisted Pair Wiring Tables A-1Using this Manual Chapter IntroductionIntroduction Getting Help SEH OverviewRepeater Functionality SEH FeaturesPolarity Detection and Correction Stackable Capabilities Optional FeaturesEpim Part Description Application Number Daughter Board Upgrade KitHubSTACK Interconnect Cables Rack Mount or Wall Mount HardwareCable Specifications HubSTACK Interconnect Cable RequirementsImpedance LengthInsertion Loss JitterCrosstalk DelayTemperature NoiseFiber Optic Budget and Propagation Delay Cable Type Attenuation Maximum Cable LengthInstallation REQUIREMENTS/SPECIFICATIONS Cable Type ConnectorsThin-net Network Requirements for the EPIM-C Module TerminatorsAUI Cable Requirements for the EPIM-A and EPIM-X Modules Network Port SpecificationsAUI Cable SEH-22 and SEH-24 Network Port Specifications SEH-32 and SEH-34 Network Port SpecificationsPin Champ Connector Installation REQUIREMENTS/SPECIFICATIONS Epim Specifications EPIM-TEPIM-F1/F2 Parameter Typical Worst Worst Case Typical Value BudgetEPIM-F3 EPIM-F3Parameter Typical Minimum Maximum Connector Type EPIM-CEPIM-A and EPIM-X AUI Port EPIM-A and EPIM-XDelay Times JAM Operating SpecificationsDelay Times Start of Packets GeneralOutput Min. Load Max. Load Max Power Fault ProtectionPower Supply Requirements JAM OutputSafety PhysicalInstalling the SEH Unpacking the SEHStacking the SEH SEH-2410BASE-T HUB with Lanview Attaching the Strain Relief Bracket Disconnect SEH and Sehi Interconnect Cables At the OUT PortInstalling the SEH in the Rack Rack Mounting the SEHWall Mounting the SEH Free-Standing Installation Shelf or Table-top InstallationInstallation Connecting the SEH to the Power Source Connecting the SEH to the Network Connecting Network Ports SEH-22 and SEH-24EPIM-2 Connecting Network Ports SEH-32 and SEH-34 Connecting a UTP Segment to an EPIM-T EPIM-T Cross-over SwitchConnecting to the Network Connecting to the Network Connecting to the Network Connecting a Thin-Net Segment to an EPIM-C EPIM-C Connecting an AUI Cable to an EPIM-A EPIM-AConnecting an AUI Cable to an EPIM-X Finishing the Installation On Position Toward Back Epim OFF Position Toward FrontChapter Troubleshooting Installation CHECK-OUTUsing Lanview PWR Green Mgmt Green FlashingRCV Yellow Flashing CLN RedLNK Green Appendix a Twisted Pair Wiring Tables Twisted Pair Wiring TablesA-2 A-3 A-4 10BASE-T From Punch Down To RJ-45 Into Block Wallplate OfficeDrop Device A-6 A-7 SEH-32/34 Punch Wall Plate Champ Down Block If Required Ethernet DeviceFigure A-1. Punch Down Block A-9 Spanish Power Supply CordGerman French