Cabletron Systems SEH-32, SEH-34, SEH-24 manual EPIM-F3

Page 24

INSTALLATION REQUIREMENTS/SPECIFICATIONS

2.3.3EPIM-F3

The EPIM-F3 shown in Figure 2-5 supports Single Mode Fiber Optic cabling. It has an internal Cabletron Systems FOT-F™ Fiber Optic Transceiver and is equipped with ST Connectors. Specifications for the EPIM-F3 are listed below.

Figure 2-5. EPIM-F3

Note: Transmitter Power decreases as temperatures rise and increases as temperatures fall. Use the Output Power Coefficient to calculate increased or decreased power output for your operating environment. For example, the typical power output at 25° C is -16.4 dBm. For a 4° C temperature increase, multiply the typical coefficient (-0.15 dBm) by four and add the result to typical output power (4 x -0.15 dBm + -16.4 = -17.0).

Page 2-12

Image 24
Contents 10BASE-T Stackable HUB USER’S Guide Printed On Recycled Paper FCC Notice DOC NoticeCabletron SYSTEMS, INC Program License Agreement Cabletron Software Program LicenseExclusion of Warranty Disclaimer of Liability United States Government Restricted RightsTable of Contents Contents Installation Connecting to the NetworkTroubleshooting Appendix B Twisted Pair Wiring Tables A-1Using this Manual Chapter IntroductionIntroduction Getting Help SEH OverviewSEH Features Repeater FunctionalityPolarity Detection and Correction Optional Features Stackable CapabilitiesEpim Daughter Board Upgrade Kit HubSTACK Interconnect CablesPart Description Application Number Rack Mount or Wall Mount HardwareCable Specifications HubSTACK Interconnect Cable RequirementsLength Insertion LossImpedance JitterDelay TemperatureCrosstalk NoiseFiber Optic Budget and Propagation Delay Cable Type Attenuation Maximum Cable LengthInstallation REQUIREMENTS/SPECIFICATIONS Connectors Thin-net Network Requirements for the EPIM-C ModuleCable Type TerminatorsNetwork Port Specifications AUI Cable Requirements for the EPIM-A and EPIM-X ModulesAUI Cable SEH-22 and SEH-24 Network Port Specifications SEH-32 and SEH-34 Network Port Specifications Pin Champ Connector Installation REQUIREMENTS/SPECIFICATIONS Epim Specifications EPIM-TEPIM-F1/F2 Parameter Typical Worst Worst Case Typical Value BudgetEPIM-F3 EPIM-F3Parameter Typical Minimum Maximum Connector Type EPIM-CEPIM-A and EPIM-X AUI Port EPIM-A and EPIM-XOperating Specifications Delay Times Start of PacketsDelay Times JAM GeneralFault Protection Power Supply RequirementsOutput Min. Load Max. Load Max Power JAM OutputSafety PhysicalInstalling the SEH Unpacking the SEHStacking the SEH SEH-2410BASE-T HUB with Lanview Attaching the Strain Relief Bracket Disconnect SEH and Sehi Interconnect Cables At the OUT PortInstalling the SEH in the Rack Rack Mounting the SEHWall Mounting the SEH Free-Standing Installation Shelf or Table-top InstallationInstallation Connecting the SEH to the Power Source Connecting the SEH to the Network Connecting Network Ports SEH-22 and SEH-24EPIM-2 Connecting Network Ports SEH-32 and SEH-34 Connecting a UTP Segment to an EPIM-T EPIM-T Cross-over SwitchConnecting to the Network Connecting to the Network Connecting to the Network Connecting a Thin-Net Segment to an EPIM-C EPIM-C Connecting an AUI Cable to an EPIM-A EPIM-AConnecting an AUI Cable to an EPIM-X Finishing the Installation On Position Toward Back Epim OFF Position Toward FrontChapter Troubleshooting Installation CHECK-OUTUsing Lanview PWR Green Mgmt Green FlashingCLN Red RCV Yellow FlashingLNK Green Appendix a Twisted Pair Wiring Tables Twisted Pair Wiring TablesA-2 A-3 A-4 From Punch Down To RJ-45 Into Block Wallplate Office 10BASE-TDrop Device A-6 A-7 SEH-32/34 Punch Wall Plate Champ Down Block If Required Ethernet DeviceFigure A-1. Punch Down Block A-9 Power Supply Cord GermanSpanish French