Black Box BRTS-100 manual Test Procedures

Page 16

CHAPTER 4: Test Procedures

NT1

TERMINAL

UNDER BRTS-100 UNIT TEST

Figure 4-2. Test Configuration 2.

Test Configuration 2 — Passive Bus (Figure 4-2)

To put the terminal in the Passive Bus Test Configuration:

1. Disconnect the terminal.

NOTE: With a passive bus, the S/T interface may disrupt the operation of the other devices on the bus.

2.Connect the S/T jack to Port B of the Test Set.

3.Connect the terminal to Port A of the Test Set.

4.The Test Set should be unter-minated; the TERMINATE button should be in.

Test Configuration 3 — Point-to-Point — Terminal (Figure 4-3) To put the circuit in the Point-to-Point — Terminal configuration:

1.Disconnect the terminal.

2.Connect the terminal to the Test Set’s A or B port.

3.Put the Test Set in REVerse mode, LINE button in.

4.The Test Set should be terminated; the TERMINATE button should be out.

TERMINAL

BRTS-100 UNIT

POINT TO POINT — TERMINAL

Figure 4-3. Test Configuration 3.

15

Image 16
Contents BRTS-100 Isdn Test Set FCC Statement BRTS-100 Isdn Test SET NOM Statement Trademarks Used in this Manual Contents Specifications Introduction How to Use This ManualOverview Features 100 EstConnecting the Unit OperationBRTS-100 Isdn Test Set controls and indicators Passive BUS Controls and Indicators Feature Buttons Powering Up the Unit Indicators Modes of Operation Test Status PASS/FAIL Lights Reflects test statusTest Procedures Test Configuration 1 Point-to-Point NT1 FigureTest Procedures Comprehensive Troubleshooting Procedure Comprehensive troubleshooting flow chart 1 Comprehensive troubleshooting flow chart 2 Check Power Phantom Conclusion LightCheck Power Check LoopTest Procedures Check loop flow chart 1 Check loop flow chart 2 Check loop flow chart 3 Test Procedures Passive Bus Configuration Check Terminations Passive Bus-Check TerminationsTest Procedures Proper device terminations diagram Pair Reversal Pair reversal flow chart 1 Pair reversal flow chart 2 10. Pair reversal diagram Monitor 11. Monitor flow chart Power-Source Indicators Technical ReferenceActivation/deactivation procedure Activation/Deactivation ModesReceive Test Line Test/Transmit See FigureLevel Test Transmit and line test AC Impedance DC ContinuityAC impedance Speaker Two Test Set units used for tracingAppendix Maintenance Battery ReplacementPin Jack Replacement Figure A-2. Replacing the 8-Pin Jack ConnectorsCopyright 2002. Black Box Corporation. All rights reserved