BRTS-100 ISDN TEST SET
|
| ECHO BITS=? |
| ||
REC. | TRANS. | ||||
|
|
| |||
|
|
| NT1 | ||
TRANS. |
|
|
| REC. | |
| D=01010101... | ||||
|
|
| |||
|
|
D=E, LINE IS GOOD, PASS
D ≠ E, LINE IS BAD, FAIL
Figure 5-4. Transmit and line test.
D Activity (See Figure
The D Activity test is designed to run when the Test Set is bridged onto the S/T interface with an ISDN terminal. D Activity will monitor the Echo bits for any D channel data transmitted by the terminal. The D Activity test is conducted as follows:
1.Upon pressing the INITIATE button, the Test Set tries to establish an ACTIVE link with the NT1.
2.If the ACTIVE state is established, the Test Set monitors the D bits and the red LED lights up whenever terminal activity is detected on the D channel (D = 0).
| ECHO BITS |
| ||
TERMINAL | RX | RX | NT1 | |
TX | TX | |||
|
| |||
| D BITS |
|
| |
RX |
|
| ||
TX |
|
| ||
|
|
| ||
| Figure | D Activity. |
|
38