Black Box BRTS-100 manual Check loop flow chart 3

Page 25

BRTS-100 ISDN TEST SET

B

CHECK FOR SHORT

IN TRANSMIT PAIR

PUT BACK IN

NORMAL MODE,

PUT IN IMPEDANCE

TEST MODE

LINE IMPEDANCE

 

RED

NT1 NOT

TEST STATUS?

 

TERMINATED

 

OR SHORT ON

 

 

 

 

 

 

TX PAIR

 

GRN

 

 

 

PROBLEM

 

WITH NT1

 

Figure 4-6. Check loop flow chart (3 of 3).

24

Image 25
Contents BRTS-100 Isdn Test Set FCC Statement BRTS-100 Isdn Test SET NOM Statement Trademarks Used in this Manual Contents Specifications Introduction How to Use This ManualOverview 100 Est FeaturesOperation Connecting the UnitBRTS-100 Isdn Test Set controls and indicators Passive BUS Controls and Indicators Feature Buttons Powering Up the UnitIndicators Test Status PASS/FAIL Lights Reflects test status Modes of OperationTest Configuration 1 Point-to-Point NT1 Figure Test ProceduresTest Procedures Comprehensive Troubleshooting Procedure Comprehensive troubleshooting flow chart 1 Comprehensive troubleshooting flow chart 2 Phantom Conclusion Light Check PowerCheck Loop Check PowerTest Procedures Check loop flow chart 1 Check loop flow chart 2 Check loop flow chart 3 Test Procedures Passive Bus-Check Terminations Passive Bus Configuration Check TerminationsTest Procedures Proper device terminations diagram Pair Reversal Pair reversal flow chart 1 Pair reversal flow chart 2 10. Pair reversal diagram Monitor 11. Monitor flow chart Technical Reference Power-Source IndicatorsActivation/Deactivation Modes Activation/deactivation procedureReceive Test Line Test/Transmit See FigureLevel Test Transmit and line test DC Continuity AC ImpedanceAC impedance Two Test Set units used for tracing SpeakerBattery Replacement Appendix MaintenanceFigure A-2. Replacing the 8-Pin Jack Connectors Pin Jack ReplacementCopyright 2002. Black Box Corporation. All rights reserved