Black Box
BRTS-100
manual
Pair reversal diagram
Specification
Check loop flow chart 1
Indicators
Connecting the Unit
Maintenance
Test Procedures
How to
Pin Jack Replacement
Check Power
Features
Page 33
BRTS-100
ISDN TEST SET
NT1
TERMINAL “A”
BRTS-100
UNIT
TERMINAL “B”
BRTS-100
UNIT
MOVE
BRTS-100
“B”
TO EVERY PORT
PASSIVE BUS
Figure
4-10.
Pair reversal diagram.
32
Page 32
Page 34
Image 33
Page 32
Page 34
Contents
BRTS-100 Isdn Test Set
FCC Statement
BRTS-100 Isdn Test SET
NOM Statement
Trademarks Used in this Manual
Contents
Specifications
How to Use This Manual
Introduction
Overview
100 Est
Features
Operation
Connecting the Unit
BRTS-100 Isdn Test Set controls and indicators
Passive BUS
Powering Up the Unit
Controls and Indicators Feature Buttons
Indicators
Test Status PASS/FAIL Lights Reflects test status
Modes of Operation
Test Configuration 1 Point-to-Point NT1 Figure
Test Procedures
Test Procedures
Comprehensive Troubleshooting Procedure
Comprehensive troubleshooting flow chart 1
Comprehensive troubleshooting flow chart 2
Phantom Conclusion Light
Check Power
Check Loop
Check Power
Test Procedures
Check loop flow chart 1
Check loop flow chart 2
Check loop flow chart 3
Test Procedures
Passive Bus-Check Terminations
Passive Bus Configuration Check Terminations
Test Procedures
Proper device terminations diagram
Pair Reversal
Pair reversal flow chart 1
Pair reversal flow chart 2
10. Pair reversal diagram
Monitor
11. Monitor flow chart
Technical Reference
Power-Source Indicators
Activation/Deactivation Modes
Activation/deactivation procedure
Line Test/Transmit See Figure
Receive Test
Level Test
Transmit and line test
DC Continuity
AC Impedance
AC impedance
Two Test Set units used for tracing
Speaker
Battery Replacement
Appendix Maintenance
Figure A-2. Replacing the 8-Pin Jack Connectors
Pin Jack Replacement
Copyright 2002. Black Box Corporation. All rights reserved
Related pages
Top
Page
Image
Contents