Black Box BRTS-100 manual Pair reversal diagram

Page 33

BRTS-100 ISDN TEST SET

NT1

TERMINAL “A”

BRTS-100 UNIT

TERMINAL “B”

BRTS-100 UNIT

MOVE BRTS-100 “B”

TO EVERY PORT

PASSIVE BUS

Figure 4-10. Pair reversal diagram.

32

Image 33
Contents BRTS-100 Isdn Test Set FCC Statement BRTS-100 Isdn Test SET NOM Statement Trademarks Used in this Manual Contents Specifications How to Use This Manual IntroductionOverview 100 Est FeaturesOperation Connecting the UnitBRTS-100 Isdn Test Set controls and indicators Passive BUS Powering Up the Unit Controls and Indicators Feature ButtonsIndicators Test Status PASS/FAIL Lights Reflects test status Modes of OperationTest Configuration 1 Point-to-Point NT1 Figure Test ProceduresTest Procedures Comprehensive Troubleshooting Procedure Comprehensive troubleshooting flow chart 1 Comprehensive troubleshooting flow chart 2 Phantom Conclusion Light Check PowerCheck Loop Check PowerTest Procedures Check loop flow chart 1 Check loop flow chart 2 Check loop flow chart 3 Test Procedures Passive Bus-Check Terminations Passive Bus Configuration Check TerminationsTest Procedures Proper device terminations diagram Pair Reversal Pair reversal flow chart 1 Pair reversal flow chart 2 10. Pair reversal diagram Monitor 11. Monitor flow chart Technical Reference Power-Source IndicatorsActivation/Deactivation Modes Activation/deactivation procedureLine Test/Transmit See Figure Receive TestLevel Test Transmit and line test DC Continuity AC ImpedanceAC impedance Two Test Set units used for tracing SpeakerBattery Replacement Appendix MaintenanceFigure A-2. Replacing the 8-Pin Jack Connectors Pin Jack ReplacementCopyright 2002. Black Box Corporation. All rights reserved