Black Box BRTS-100 manual Check Loop, Check Power

Page 21

BRTS-100 ISDN TEST SET

 

 

CHECK POWER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PUT CIRCUIT IN

 

 

 

 

POINT TO POINT

 

 

 

 

CONFIG. (CONFIG. 1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DOES

 

NO

 

 

TERMINAL

 

 

 

NEED PHANTOM

 

 

 

 

POWER?

 

 

 

RED

 

 

 

YES

GRN

 

 

 

 

 

PHANTOM

 

 

 

 

 

 

 

 

 

LIGHT?

 

 

 

 

 

 

 

NONE

 

 

 

 

 

 

 

 

 

TX & RX

NO

 

 

PAIRS

BATTERY

 

 

TRANSPOSED

FROM NT1

 

 

CHECK POWER

If the terminal requires power from the line, this procedure will verify that power is being transmitted properly. Assumes the Test Set is in NORMAL mode.

DOES

 

 

YES

 

 

TERMINAL NEED

 

 

 

 

 

 

PS2 POWER?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

 

GRN

RED

 

 

 

 

 

 

AUX LIGHT?

 

 

 

 

 

 

NONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

 

WIRES

POWER OK

 

 

BATTERY

ON PINS 7

 

 

ON PINS

 

& 8 ARE

 

 

 

 

 

 

 

7 & 8

CROSSED

Figure 4-5. Check power flow chart.

4.4 Check Loop

This procedure checks for physical impairments in the S/T interface. See Figure 4-6 for an outline of the functions performed during this test. Before implementing this procedure, you must meet the following prerequisites:

The terminal should be receiving proper power (see CHECK POWER, page 14).

LINE TEST should fail.

20

Image 21
Contents BRTS-100 Isdn Test Set FCC Statement BRTS-100 Isdn Test SET NOM Statement Trademarks Used in this Manual Contents Specifications How to Use This Manual IntroductionOverview 100 Est FeaturesOperation Connecting the UnitBRTS-100 Isdn Test Set controls and indicators Passive BUS Powering Up the Unit Controls and Indicators Feature ButtonsIndicators Test Status PASS/FAIL Lights Reflects test status Modes of OperationTest Configuration 1 Point-to-Point NT1 Figure Test ProceduresTest Procedures Comprehensive Troubleshooting Procedure Comprehensive troubleshooting flow chart 1 Comprehensive troubleshooting flow chart 2 Phantom Conclusion Light Check PowerCheck Loop Check PowerTest Procedures Check loop flow chart 1 Check loop flow chart 2 Check loop flow chart 3 Test Procedures Passive Bus-Check Terminations Passive Bus Configuration Check TerminationsTest Procedures Proper device terminations diagram Pair Reversal Pair reversal flow chart 1 Pair reversal flow chart 2 10. Pair reversal diagram Monitor 11. Monitor flow chart Technical Reference Power-Source IndicatorsActivation/Deactivation Modes Activation/deactivation procedureLine Test/Transmit See Figure Receive TestLevel Test Transmit and line test DC Continuity AC ImpedanceAC impedance Two Test Set units used for tracing SpeakerBattery Replacement Appendix MaintenanceFigure A-2. Replacing the 8-Pin Jack Connectors Pin Jack ReplacementCopyright 2002. Black Box Corporation. All rights reserved