Black Box BRTS-100 manual Pair Reversal

Page 30

CHAPTER 4: Test Procedures

4.6 Pair Reversal

When you use the passive-bus configuration, it’s imperative that all the transmit pairs (from terminal) be wired the same. That is to say, pins 3 and 6 from each terminal on the bus must be wired to pins 3 and 6 of the NT1 respectively. On a point-to-point configuration, the circuit will operate properly even if the pair is reversed (pin 3 [terminal] to pin 6 [NT1], pin 6 [terminal] to pin 3 [NT1]). However, on a passive-bus configuration, if two terminals are wired differently, their signals, (having opposite polarity) will cancel each other.

This problem, known as pair reversal, usually occurs when the installer accidentally transposes the pairs in the S/T interface cable. A common symptom of pair reversal is that a device works when it is by itself on the bus, but doesn’t work when other devices are present on the bus.

To identify this condition, an additional Test Set or any terminal that initializes itself automatically is required (check with terminal manufacturer). Refer to the Pair Reversal Flow Chart in Figure 4-9 and the diagram in Figure 4-10 for an outline of the functions performed during this test.

This procedure assumes that LINE TEST passes on each individual port on the bus.

1.Remove all terminals from the passive bus.

2.Place the first Test Set or ISDN terminal on the last port of the passive bus. This will be referred to as terminal A.

3.Terminate terminal A at 100 ohms. If you’re using the Test Set as terminal A, the TERMINATE button should be out.

4.If terminal A is:

a.The Test Set, put it in the LINE TEST test mode.

b.An ISDN terminal, power it on.

5.Take the second Test Set, which will be known as terminal B, and connect it to another port on the bus.

6.Unterminate terminal B by pressing the TERMINATE button.

7.Put terminal B in the LINE TEST Test Mode.

8.Press the INITIATE button.

9.a. If the Green Test Status light goes on, terminals A and B are using the same polarity.

29

Image 30
Contents BRTS-100 Isdn Test Set FCC Statement BRTS-100 Isdn Test SET NOM Statement Trademarks Used in this Manual Contents Specifications How to Use This Manual IntroductionOverview Features 100 EstConnecting the Unit OperationBRTS-100 Isdn Test Set controls and indicators Passive BUS Powering Up the Unit Controls and Indicators Feature ButtonsIndicators Modes of Operation Test Status PASS/FAIL Lights Reflects test statusTest Procedures Test Configuration 1 Point-to-Point NT1 FigureTest Procedures Comprehensive Troubleshooting Procedure Comprehensive troubleshooting flow chart 1 Comprehensive troubleshooting flow chart 2 Check Power Phantom Conclusion LightCheck Power Check LoopTest Procedures Check loop flow chart 1 Check loop flow chart 2 Check loop flow chart 3 Test Procedures Passive Bus Configuration Check Terminations Passive Bus-Check TerminationsTest Procedures Proper device terminations diagram Pair Reversal Pair reversal flow chart 1 Pair reversal flow chart 2 10. Pair reversal diagram Monitor 11. Monitor flow chart Power-Source Indicators Technical ReferenceActivation/deactivation procedure Activation/Deactivation ModesLine Test/Transmit See Figure Receive TestLevel Test Transmit and line test AC Impedance DC ContinuityAC impedance Speaker Two Test Set units used for tracingAppendix Maintenance Battery ReplacementPin Jack Replacement Figure A-2. Replacing the 8-Pin Jack ConnectorsCopyright 2002. Black Box Corporation. All rights reserved