BRTS-100 ISDN TEST SET
13.a. If the terminal works, there’s no need to proceed any further.
b.If the terminal does not work, proceed to step 14.
14.Perform the PAIR REVERSAL test procedure (see page 22).
15.Put the circuit into its normal operating configuration. (Connect all terminals to the S/T interface.)
16.a. If the terminal works, there’s no need to proceed any further.
b.If the terminal does not work, proceed to step 17.
17.At this point, you’ve determined that there’s nothing wrong physically with the S/T interface. The problem is either within the terminal or
A
USING PASSIVE | NO | |
MONITOR | ||
BUS? | ||
| ||
| YES | |
PB1 - CHECK | DONE | |
TERMINATIONS | ||
|
TERMINAL | NO | PB2 - PAIR | TERMINAL |
WORK? |
| REVERSAL | WORK? |
NO
YES
YES
GOOD LINE, | GOOD LINE, |
DONE | DONE |
Figure 4-4. Comprehensive troubleshooting flow chart (2 of 2).
18