Chapter 3 | Installation Overview |
|
Chapter contents |
|
|
Introduction | 24 | |
Unpacking and Inspection | 24 | |
Site Preparation | 24 | |
Site Environment | 25 | |
Planning Your Site | 25 | |
Site Requirements | 25 | |
Operating Environment Requirements | 26 | |
Power Supply Requirements | 27 | |
Distribution Rack Requirements | 27 | |
Mechanical Recommendations for the Rack | 28 | |
Protective Grounding for the Rack and Chassis | 28 | |
Space Requirements for the Rack | 28 | |
Securing the Rack | 28 | |
Tools and Equipment for Installation and Maintenance | 29 | |
OnSite System Installation | 29 | |
Mounting the Chassis to an EIA/TIA | 29 | |
Mounting the Chassis to an ETSI Rack | 30 | |
Mounting the Chassis on the Wall | 32 | |
Installing the Chassis Ground Connection | 33 | |
Connecting Power to the | 33 | |
Connecting AC Power to the | 34 | |
Powering On the | 35 | |
Connecting DC Power to the | 35 | |
Wiring Procedure for DC Input Power | 35 | |
Checking the | 38 |
23