Patton electronic 07MOS10xx-GS, 1063 manual Checking the OS-10 System Installation

Page 38

OnSite Series Getting Started Guide

3 • Installation Overview

 

 

9.Connect the negative lead of the circuit to the “B” power input lead on the OS-10 system terminal block. See wiring 3-B on figure 13 on page 36.

Note The terminal block indicates the “B” power lead by the letter B. This lead is third from the top on the OS-10 system terminal block.

Do not over torque the terminal block captive thumbscrew or ter- minal block contact screws.

CAUTION

10.Secure the wires using cable ties or similar appropriate cable tie-downs.

11.Turn on power to the DC circuit.

Note The green PWR (power) LED on the front panel is lit when the sys- tem receives power from the DC source.

Checking the OS-10 System Installation

When you first apply power to the system, the STAT (status) LED shows a solid amber light. This light indi- cates that the system is booting. The STAT LED turns to a solid green light when the system completes the boot process and is ready for operation.

OnSite System Installation

38

Image 38
Contents Metro-Optical Transport Access Nodes Mailsupport@patton.com Summary Table of Contents Table of Contents System Management Access Terms and Acronyms List of Figures List of Tables About this guide AudiencePrecautions StructureMouse conventions Typographical conventions used in this documentGeneral conventions Safety when using electricity Power CableElectrostatic Discharge Damage Optical SafetyFiber-Optic Safety Precautions Fiber-Optic PortsChapter contents Product OverviewIntroduction OnSite PlatformsSDH Trunks OS1052 Base System Application Overview OS1052 Application Typical OS1052 applicationOS1052 Map + Modules OS1063 Application Typical OS1063 applicationOS1063 Map + Modules Installation Overview Unpacking and Inspection Site PreparationSite Requirements Site EnvironmentPlanning Your Site Operating Environment Requirements Power Supply Requirements Space Requirements for the Rack Mechanical Recommendations for the RackProtective Grounding for the Rack and Chassis Securing the RackMounting the Chassis to an EIA/TIA 19-Inch Rack Tools and Equipment for Installation and MaintenanceOnSite System Installation Mounting the Chassis to an Etsi Rack Mounting the OS-10 System Chassis in an EIA/TIA 19-Inch RackMounting the OS-10 System in an Etsi 300-mm Rack Mounting the Chassis on the Wall Mounting the OS-10 System Chassis on a WallInstalling the Chassis Ground Connection Connecting Power to the OS-10 SystemConnecting AC Power to the OS-10 System Powering On the OS-10 System with AC Power Wiring the OS-10 System for DC Power Installation Overview Checking the OS-10 System Installation System Management Access General Overview Ethernet LAN Management Port Detail of the Management PortsProvides the pin assignments for the RJ-45 connector Serial Management PortGaining Access to the System Access through the Serial PortAccess through the Ethernet LAN Management Port Web-Based Management Interface Launching the GUI ApplicationGUI Frames Provides Autonomous Alarm Messages Configuring an Snmp Trap ReceiverConfiguring an Authorized OnSight NMS Server Engineering Orderwire EOW Location of EOW port AUX 1 on OS-10 Series ChassisSystem Management Access Configuring the Engineering Orderwire EOW Function System Management Access Contacting Patton for assistance Warranty coverage Contact informationReturn for credit policy RMA numbersAppendix a Compliance information Radio and TV Interference SafetyCompliance FCC Part 68 Acta StatementDeclaration of Conformity Authorized European RepresentativeAppendix B Specifications Model OS1052 Power DimensionsWeight OperationsModel OS1063 Operations Appendix C Terms and Acronyms Abbreviations Abbreviation MeaningLcas TDM