OnSite Series Getting Started Guide | 3 • Installation Overview |
|
|
9.Connect the negative lead of the circuit to the “B” power input lead on the
Note The terminal block indicates the “B” power lead by the letter B. This lead is third from the top on the
Do not over torque the terminal block captive thumbscrew or ter- minal block contact screws.
CAUTION
10.Secure the wires using cable ties or similar appropriate cable
11.Turn on power to the DC circuit.
Note The green PWR (power) LED on the front panel is lit when the sys- tem receives power from the DC source.
Checking the OS-10 System Installation
When you first apply power to the system, the STAT (status) LED shows a solid amber light. This light indi- cates that the system is booting. The STAT LED turns to a solid green light when the system completes the boot process and is ready for operation.
OnSite System Installation | 38 |