Patton electronic 07MOS10xx-GS, 1063 Mechanical Recommendations for the Rack, Securing the Rack

Page 28

OnSite Series Getting Started Guide

3 • Installation Overview

 

 

Mechanical Recommendations for the Rack

The following information will help you plan your equipment rack configuration:

Use a rack made of steel or aluminum.

Install equipment in the lower half of the rack first to avoid making the rack top heavy.

The rack should be able to support the full weight of the final installed chassis.

Enclosed racks must have adequate ventilation. Ensure that the rack is not overly congested because each unit generates heat. An enclosed rack should have louvered sides and a fan to provide cooling air.

When mounting a chassis in an open rack, ensure that the rack frame does not block the cooling holes. If the chassis is installed on slides, check the position of the chassis when it is seated all the way into the rack.

In an enclosed rack with a ventilation fan in the top, excessive heat generated by equipment near the bot- tom of the rack can be drawn upward and into the intake ports of the equipment above it in the rack. In addition, ensure that you provide adequate ventilation for equipment at the bottom of the rack.

Baffles can help isolate exhaust air from intake air, which also helps draw cooling air through the chassis. The best placement of the baffles depends on the airflow patterns in the rack, which can be found by exper- imenting with different arrangements.

Protective Grounding for the Rack and Chassis

Use a rack grounding kit and a ground conductor that is carried back to earth or another suitable building ground. The OS-10 chassis is designed with mounting brackets that provide solid metal-to-metal connection to the rack. If you do not use equipment racks, you can attach a wiring terminal directly to the chassis at the position indicated for appropriate grounding. Figure 9 shows the location of the grounding terminal location for the OS-10 chassis.

Figure 9. Grounding Terminal Location for the OS-10 System Chassis

Note Because building codes vary worldwide, OnSite Systems strongly rec- ommends that you consult an electrical contractor to ensure that proper equipment grounding is in place for your specific installation.

Space Requirements for the Rack

Provide enough space in front of and behind the OS-10 system chassis so that you can service it easily. Typi- cally, allow a minimum of 122 cm (48 inches) in front of the rack and 61 cm (24 inches) behind the rack.

Securing the Rack

The rack should be attached to the equipment room floor with 9.5-mm (3/8-inch) lag screws or equivalent hardware. The floor under the rack should be level within 5 mm (3/16 inch). Use a floor-leveling cement com- pound if necessary or bolt the racks to the floor.

Planning Your Site

28

Image 28
Contents Metro-Optical Transport Access Nodes Mailsupport@patton.com Summary Table of Contents Table of Contents System Management Access Terms and Acronyms List of Figures List of Tables About this guide AudiencePrecautions StructureGeneral conventions Typographical conventions used in this documentMouse conventions Safety when using electricity Power CableOptical Safety Fiber-Optic Safety PrecautionsElectrostatic Discharge Damage Fiber-Optic PortsChapter contents Product OverviewIntroduction OnSite PlatformsSDH Trunks OS1052 Base System Application Overview OS1052 Application Typical OS1052 applicationOS1052 Map + Modules OS1063 Application Typical OS1063 applicationOS1063 Map + Modules Installation Overview Unpacking and Inspection Site PreparationPlanning Your Site Site EnvironmentSite Requirements Operating Environment Requirements Power Supply Requirements Mechanical Recommendations for the Rack Protective Grounding for the Rack and ChassisSpace Requirements for the Rack Securing the RackOnSite System Installation Tools and Equipment for Installation and MaintenanceMounting the Chassis to an EIA/TIA 19-Inch Rack Mounting the Chassis to an Etsi Rack Mounting the OS-10 System Chassis in an EIA/TIA 19-Inch RackMounting the OS-10 System in an Etsi 300-mm Rack Mounting the Chassis on the Wall Mounting the OS-10 System Chassis on a WallInstalling the Chassis Ground Connection Connecting Power to the OS-10 SystemConnecting AC Power to the OS-10 System Powering On the OS-10 System with AC Power Wiring the OS-10 System for DC Power Installation Overview Checking the OS-10 System Installation System Management Access General Overview Ethernet LAN Management Port Detail of the Management PortsProvides the pin assignments for the RJ-45 connector Serial Management PortGaining Access to the System Access through the Serial PortAccess through the Ethernet LAN Management Port Web-Based Management Interface Launching the GUI ApplicationGUI Frames Provides Autonomous Alarm Messages Configuring an Snmp Trap ReceiverConfiguring an Authorized OnSight NMS Server Engineering Orderwire EOW Location of EOW port AUX 1 on OS-10 Series ChassisSystem Management Access Configuring the Engineering Orderwire EOW Function System Management Access Contacting Patton for assistance Warranty coverage Contact informationReturn for credit policy RMA numbersAppendix a Compliance information Safety ComplianceRadio and TV Interference FCC Part 68 Acta StatementDeclaration of Conformity Authorized European RepresentativeAppendix B Specifications Model OS1052 Dimensions WeightPower OperationsModel OS1063 Operations Appendix C Terms and Acronyms Abbreviations Abbreviation MeaningLcas TDM