Teledyne 3160 manual Installation, Unpacking the Analyzer, Front Panel, Qty Description

Page 19

Installation 3

Installation

Installation of the analyzer includes:

1.Unpacking the system.

2.Recognizing the necessary precautions when installing the system.

3.Hooking up the sample/span gas and air supply to appropriate connections.

4.Installing the Micro-Fuel Cell sensor(s).

5.Hooking up electrical connections.

6.Testing the system.

3.1Unpacking the Analyzer

The analyzer is shipped with all the materials and special items you need to install and prepare the system for operation. Carefully unpack the analyzer and inspect it for damage. Immediately report any damage to the shipping agent. Remove the packing slip and verify that you have received all the components listed in Table 3-1.

 

Table 3-1. Accessory Kit for Model 3160

Qty

Part No.

Description

3

G285

Weld glands, VCR-type

3

G284

Gaskets, VCR-type

3

N284

Nuts, female (Hoke 4NM316)

2

W64

Wrench, Open End, 3/4"–5/8"

1

M52973

Instruction Manual

3.2Front Panel

The Model 3160 front and rear panels are illustrated in Figure 3–1 on the follow- ing page. The front panel contains the following displays and controls:

1.Main power switch.

2.Light Emitting Diode (LED) display: the O2 concentration is displayed in bold lettering.

TELEDYNE ANALYTICAL INSTRUMENTS

3-1

Image 19
Contents Model Copyright 1999 Teledyne Analytical Instruments Iii Table of Contents Appendix Maintenance & TroubleshootingTeledyne Analytical Instruments Introduction FeaturesFixed Features Variable FeaturesIntroduction Options and Model Numbers Introduction Components3160DA Dual fuel cell Introduction Applications Principles of Operation Operational TheoryMajor Components Sample System Operational Theory Micro-Fuel Cell SensorOperational Theory Model 3160 flow schematic Electronics and Signal Processing Operational Theory Identifier Range Scale Voltage CurrentmA Analog signal output offsetDefaults Programmable Options Qty Description InstallationUnpacking the Analyzer Front PanelRear Panel Analyzer front and rear panels Sample Gas Installation Gas Line ConnectionsSpan Gas Instrument Air Compressed Air FittingSensor Installation Electrical Connections 3160 Rear Panel Voltage SelectionRemoving the Voltage Card Fuse ChangingFuse Replacement 3 RS-232 Serial Digital Port Installation ChecklistFront Panel Controls OperationsSpinning Wheel Modes of OperationCell Output Factor Span Factor Operations Uled Span in Progress Changing Passwords For Remote Monitoring and ControlOperations Cold Start-Up Operations Calibration Zeroing Operations Operations Calibration Using Span Gas Operations Operations Operations Select Active Sensor Two Cells Only Setup Operations Accpt Operations O2 Range Set-UpCold Start Operations Set-Up AlarmsOperations Operations Logger Set-Up Operations Operations Set-Up Clock Functions Accpt Teledyne Analytical Instruments Operations Operations System Statistics Ascii Data Bits 7 or Stop Bits 1 or Baud rateComm. Std. for 1200B Bell USA/CCITT Operations Operations Scrubber Maintenance Maintenance & TroubleshootingRoutine Maintenance Sensor MaintenanceSymptom Cause Correction TroubleshootingMaintenance & Troubleshooting Symptom Cause Correction Maintenance & Troubleshooting Operating Temperature0-50C 32 -122 F SpecificationsAppendix Teledyne Analytical Instruments Altitude 1,609 m Relative Humidy Up to 99%Drawing List Appendix Recommended Spare Parts ListMaterial or Component S. # Quantity Appendix Material Safety Data SheetCustomer Service Extension Environmental Health Date Prepared 2/12/96Section IV Fire and Explosion Hazard Data Exposure Protective measures during cell replacementSection Viii Control Measures Phone Product NameManufacturer AddressEffects of overexposure Ingestion Signs/symptoms of exposurePrimary route of entry Exposure limits Osha PELDisposal Protective measures