Teledyne 3160 manual Operations Cold Start-Up

Page 33

Operations 4

Cold Start-Up

1.A cold start will automatically occur the first time you start the analyzer. In any other situation, you can cold start by turning the analyzer off and holding down the red key below the LCD screen while you turn the power back on. Continue to hold the red key until the screen comes on. There will be a two minute wait for system initialization before the second screen.

A warm start will take you directly to step 5.

2.Set the time using the SELEC, UP and DOWN keys, and press ACCPT.

3.Select sensor A or B as the active sensor.

(This menu is omitted if only one cell block is installed.)

4.If you have not done so, connect the sample gas to the sample port and press ACK.

5.Using the valve and meter on the sample gas supply, set the flow rate to 2 SCFH and press ACK.

If you have warm-started, this is the second screen you will see.

6.The main Analyze mode menu will appear, and the

measured O2 level of the sample gas will display. The system should first be zeroed, then spanned, to obtain the most accurate O2 measurements.

TELEDYNE ANALYTICAL INSTRUMENTS

4-5

Image 33
Contents Model Copyright 1999 Teledyne Analytical Instruments Iii Table of Contents Appendix Maintenance & TroubleshootingTeledyne Analytical Instruments Fixed Features FeaturesVariable Features IntroductionIntroduction Introduction Components Options and Model Numbers3160DA Dual fuel cell Introduction Applications Principles of Operation Operational TheoryMajor Components Sample System Operational Theory Micro-Fuel Cell SensorOperational Theory Model 3160 flow schematic Electronics and Signal ProcessingOperational Theory Identifier Range Scale Voltage CurrentmA Analog signal output offsetDefaults Programmable Options Unpacking the Analyzer InstallationFront Panel Qty DescriptionRear Panel Analyzer front and rear panels Span Gas Installation Gas Line ConnectionsInstrument Air Compressed Air Fitting Sample GasSensor Installation Electrical Connections 3160 Rear Panel Voltage SelectionRemoving the Voltage Card Fuse ChangingFuse Replacement 3 RS-232 Serial Digital Port Installation ChecklistFront Panel Controls OperationsModes of Operation Spinning WheelCell Output Factor Span Factor Operations Uled Span in Progress Changing Passwords For Remote Monitoring and ControlOperations Cold Start-Up Operations Calibration Zeroing Operations Operations Calibration Using Span Gas Operations Operations Operations Select Active Sensor Two Cells Only Setup Operations Accpt Operations O2 Range Set-UpCold Start Operations Set-Up AlarmsOperations Operations Logger Set-Up Operations Operations Set-Up Clock Functions Accpt Teledyne Analytical Instruments Operations Operations System Statistics Baud rate Ascii Data Bits 7 or Stop Bits 1 orComm. Std. for 1200B Bell USA/CCITT Operations Operations Routine Maintenance Maintenance & TroubleshootingSensor Maintenance Scrubber MaintenanceSymptom Cause Correction TroubleshootingMaintenance & Troubleshooting Symptom Cause Correction Maintenance & Troubleshooting Specifications Operating Temperature0-50C 32 -122 FAppendix Teledyne Analytical Instruments Altitude 1,609 m Relative Humidy Up to 99%Drawing List Appendix Recommended Spare Parts ListCustomer Service Extension Environmental Health Appendix Material Safety Data SheetDate Prepared 2/12/96 Material or Component S. # QuantitySection IV Fire and Explosion Hazard Data Exposure Protective measures during cell replacementSection Viii Control Measures Manufacturer Product NameAddress PhonePrimary route of entry Signs/symptoms of exposureExposure limits Osha PEL Effects of overexposure IngestionDisposal Protective measures