Teledyne 3160 manual Setup

Page 40

4 Operations

Install Sensor and Test Alternate Sensor (Two Cells Only)

1. Enter set-up from the Analyze mode by pressing

SETUP.

If only one cell is installed, the TEST and INSTL op- tions on the next screen are omitted.

2. Press TEST to test the alternate sensor or INSTL to in- stall a new sensor.

3. If TEST was chosen in step 2, the active sensor is dis- played and you are directed to press ACK to test the al- ternate sensor.

If INSTL was chosen in step 2, go to step 5.

4. After pressing ACK in step 3, the alternate sensor is flushed for 10 minutes while the measured O2 level is displayed. The 10 minute flush may be restarted by pressing RESET, or aborted by pressing SKIP. Go to step 8.

5. If INSTL was chosen in step 3, the screen will display the active sensor. Press A or B for the sensor you are installing.

6. Install the sensor (either A or B from step 5) into the sensor block within two minutes, and press ACK.

4-12

TELEDYNE ANALYTICAL INSTRUMENTS

Image 40
Contents Model Copyright 1999 Teledyne Analytical Instruments Iii Table of Contents Maintenance & Troubleshooting AppendixTeledyne Analytical Instruments Features Fixed FeaturesVariable Features IntroductionIntroduction Options and Model Numbers Introduction Components3160DA Dual fuel cell Introduction Applications Operational Theory Principles of OperationMajor Components Operational Theory Micro-Fuel Cell Sensor Sample SystemOperational Theory Electronics and Signal Processing Model 3160 flow schematicOperational Theory Analog signal output offset Identifier Range Scale Voltage CurrentmADefaults Programmable Options Installation Unpacking the AnalyzerFront Panel Qty DescriptionRear Panel Analyzer front and rear panels Installation Gas Line Connections Span GasInstrument Air Compressed Air Fitting Sample GasSensor Installation Electrical Connections Voltage Selection 3160 Rear PanelFuse Changing Removing the Voltage CardFuse Replacement Installation Checklist 3 RS-232 Serial Digital PortOperations Front Panel ControlsSpinning Wheel Modes of OperationCell Output Factor Span Factor Operations Changing Passwords For Remote Monitoring and Control Uled Span in ProgressOperations Cold Start-Up Operations Calibration Zeroing Operations Operations Calibration Using Span Gas Operations Operations Operations Select Active Sensor Two Cells Only Setup Operations Operations O2 Range Set-Up AccptOperations Set-Up Alarms Cold StartOperations Operations Logger Set-Up Operations Operations Set-Up Clock Functions Accpt Teledyne Analytical Instruments Operations Operations System Statistics Ascii Data Bits 7 or Stop Bits 1 or Baud rateComm. Std. for 1200B Bell USA/CCITT Operations Operations Maintenance & Troubleshooting Routine MaintenanceSensor Maintenance Scrubber MaintenanceTroubleshooting Symptom Cause CorrectionMaintenance & Troubleshooting Symptom Cause Correction Maintenance & Troubleshooting Operating Temperature0-50C 32 -122 F SpecificationsAppendix Altitude 1,609 m Relative Humidy Up to 99% Teledyne Analytical InstrumentsAppendix Recommended Spare Parts List Drawing ListAppendix Material Safety Data Sheet Customer Service Extension Environmental HealthDate Prepared 2/12/96 Material or Component S. # QuantitySection IV Fire and Explosion Hazard Data Protective measures during cell replacement ExposureSection Viii Control Measures Product Name ManufacturerAddress PhoneSigns/symptoms of exposure Primary route of entryExposure limits Osha PEL Effects of overexposure IngestionProtective measures Disposal