Teledyne 3160 manual Operations System Statistics

Page 51

Operations 4

System Statistics

1.Enter set-up from the Analyze mode by pressing

SETUP.

ESC in any status page will take you to the last set-up screen and eventually the main analyze mode.

PREV steps you back one status page. NEXT moves forward one status page.

2.Press STAT for system status.

(If only one cell block is installed, TEST and INSTL will be omitted.)

3.Status page one displays the active sensor (A or B), the system time/date, and the system hardware configura- tion. The number and date of the installed software ver- sion are also shown.

Press PREV for the previous screen, or NEXT for the next screen.

4.Status page two shows the O2 level set for spanning, the cell strength factor, the type and time of the last span, the time interval for scheduled spanning (AutoSpan), and whether or not scheduled spanning is active. [The cell strength factor is an indication of the amount of cell life left in the cell, with 1.00 being the most and 0.00 be- ing the least.]

5.Status page three shows the time of the last zero, the time interval for scheduled zeroing (AutoZero), and whether or not scheduled zeroing is active.

6.Status page four shows the settings for the five pro- grammable alarms.

TELEDYNE ANALYTICAL INSTRUMENTS

4-23

Image 51
Contents Model Copyright 1999 Teledyne Analytical Instruments Iii Table of Contents Appendix Maintenance & TroubleshootingTeledyne Analytical Instruments Introduction FeaturesFixed Features Variable FeaturesIntroduction Introduction Components Options and Model Numbers3160DA Dual fuel cell Introduction Applications Principles of Operation Operational TheoryMajor Components Sample System Operational Theory Micro-Fuel Cell SensorOperational Theory Model 3160 flow schematic Electronics and Signal ProcessingOperational Theory Identifier Range Scale Voltage CurrentmA Analog signal output offsetDefaults Programmable Options Qty Description InstallationUnpacking the Analyzer Front PanelRear Panel Analyzer front and rear panels Sample Gas Installation Gas Line ConnectionsSpan Gas Instrument Air Compressed Air FittingSensor Installation Electrical Connections 3160 Rear Panel Voltage SelectionRemoving the Voltage Card Fuse ChangingFuse Replacement 3 RS-232 Serial Digital Port Installation ChecklistFront Panel Controls OperationsModes of Operation Spinning WheelCell Output Factor Span Factor Operations Uled Span in Progress Changing Passwords For Remote Monitoring and ControlOperations Cold Start-Up Operations Calibration Zeroing Operations Operations Calibration Using Span Gas Operations Operations Operations Select Active Sensor Two Cells Only Setup Operations Accpt Operations O2 Range Set-UpCold Start Operations Set-Up AlarmsOperations Operations Logger Set-Up Operations Operations Set-Up Clock Functions Accpt Teledyne Analytical Instruments Operations Operations System Statistics Baud rate Ascii Data Bits 7 or Stop Bits 1 orComm. Std. for 1200B Bell USA/CCITT Operations Operations Scrubber Maintenance Maintenance & TroubleshootingRoutine Maintenance Sensor MaintenanceSymptom Cause Correction TroubleshootingMaintenance & Troubleshooting Symptom Cause Correction Maintenance & Troubleshooting Specifications Operating Temperature0-50C 32 -122 FAppendix Teledyne Analytical Instruments Altitude 1,609 m Relative Humidy Up to 99%Drawing List Appendix Recommended Spare Parts ListMaterial or Component S. # Quantity Appendix Material Safety Data SheetCustomer Service Extension Environmental Health Date Prepared 2/12/96Section IV Fire and Explosion Hazard Data Exposure Protective measures during cell replacementSection Viii Control Measures Phone Product NameManufacturer AddressEffects of overexposure Ingestion Signs/symptoms of exposurePrimary route of entry Exposure limits Osha PELDisposal Protective measures