Teledyne 3160 manual Operations

Page 37

Operations 4

7.If AUTO was chosen in step 6, wait for the O2 level to settle before the system spans. This may take from fif- teen (15) to thirty (30) minutes or longer, depending on the sample gas oxygen level.

Go to step 11 if MAN was chosen in step 6.

8.If any key was pressed in step 7, the screen indicates that the span has been aborted. Press ACK to retry spanning, or ESC to abort the span.

9.After the system has automatically detected sensor sta- bility, the system will automatically span. If the system spans correctly, the next screen will be the Analyze mode main menu (see step 14).

10.If the O2 cell current is too strong or too weak to be spanned, an error message will appear. Insure that the span gas concentration has been entered correctly. Press ACK to retry, or ESC to abort the span.

11.If MAN was pressed in step 6, watch the logger or the

O2 value on the screen to determine when the output is constant, and then press ACK.

12.After step 11, the system will automatically span to the user-entered span value.

TELEDYNE ANALYTICAL INSTRUMENTS

4-9

Image 37
Contents Model Copyright 1999 Teledyne Analytical Instruments Iii Table of Contents Appendix Maintenance & TroubleshootingTeledyne Analytical Instruments Fixed Features FeaturesVariable Features IntroductionIntroduction Options and Model Numbers Introduction Components3160DA Dual fuel cell Introduction Applications Principles of Operation Operational TheoryMajor Components Sample System Operational Theory Micro-Fuel Cell SensorOperational Theory Model 3160 flow schematic Electronics and Signal ProcessingOperational Theory Identifier Range Scale Voltage CurrentmA Analog signal output offsetDefaults Programmable Options Unpacking the Analyzer InstallationFront Panel Qty DescriptionRear Panel Analyzer front and rear panels Span Gas Installation Gas Line ConnectionsInstrument Air Compressed Air Fitting Sample GasSensor Installation Electrical Connections 3160 Rear Panel Voltage SelectionRemoving the Voltage Card Fuse ChangingFuse Replacement 3 RS-232 Serial Digital Port Installation ChecklistFront Panel Controls OperationsSpinning Wheel Modes of OperationCell Output Factor Span Factor Operations Uled Span in Progress Changing Passwords For Remote Monitoring and ControlOperations Cold Start-Up Operations Calibration Zeroing Operations Operations Calibration Using Span Gas Operations Operations Operations Select Active Sensor Two Cells Only Setup Operations Accpt Operations O2 Range Set-UpCold Start Operations Set-Up AlarmsOperations Operations Logger Set-Up Operations Operations Set-Up Clock Functions Accpt Teledyne Analytical Instruments Operations Operations System Statistics Ascii Data Bits 7 or Stop Bits 1 or Baud rateComm. Std. for 1200B Bell USA/CCITT Operations Operations Routine Maintenance Maintenance & TroubleshootingSensor Maintenance Scrubber MaintenanceSymptom Cause Correction TroubleshootingMaintenance & Troubleshooting Symptom Cause Correction Maintenance & Troubleshooting Operating Temperature0-50C 32 -122 F SpecificationsAppendix Teledyne Analytical Instruments Altitude 1,609 m Relative Humidy Up to 99%Drawing List Appendix Recommended Spare Parts ListCustomer Service Extension Environmental Health Appendix Material Safety Data SheetDate Prepared 2/12/96 Material or Component S. # QuantitySection IV Fire and Explosion Hazard Data Exposure Protective measures during cell replacementSection Viii Control Measures Manufacturer Product NameAddress PhonePrimary route of entry Signs/symptoms of exposureExposure limits Osha PEL Effects of overexposure IngestionDisposal Protective measures