Applications
Configure Remote Site Profiles for Frame Relay with ISDN backup
Frame Relay operation is set-up as described in section 2.3.2
The PVC on both partner routers must be disabled during this
ISDN call
Recovery operation is
If the ISDN circuit is to be available only at specified times, rather than all the time (the default),
Activation Schedule
Location: Main
ªConfiguration
ªWAN Set up
ªRemote Site
ªEdit Remote Site
ªConnection
ªActivation
ªSchedule
Enter “a” and the times the recovery circuit is to be made available, enter “d” and the times the recovery circuit is to be deactivated.
Enable the secondary activation circuit for recovery
Recovery
Location: Main
ªConfiguration
ªWAN Set up
ªRemote Site
ªEdit Remote Site
ªConnection
ªRecovery
The recovery schedules MUST be set identically on both partner PPP routers to operate; if they are not, one router will try to bring the link up and the other will shut it down.
46