General product information

3.3.2Unit Handling

If possible, transport the unit using a forklift or pallet jack.

If using a forklift or pallet jack, ensure that the fork tine length is suitable to safely move the packaged unit.

Liebert recommends keeping the unit in the protective packaging until it has been moved to the installation site.

When handling and unpacking the unit, exercise great care to prevent damage.

Do not lift the unit any higher than 6" (152mm) while moving it. If it must be lifted higher than 6" (152mm), exercise great care and keep all personnel who are not helping move the unit at least 20' (5m) away from the unit.

The Liebert XDH ships with four outrigger-style wheels to permit rolling it into position. Liebert recommends using a forklift or pallet jack to move the Liebert XDH as near as practical to its installation site before removing it from the shipping pallet.

3.3.3Unpacking the Unit

1.Remove the exterior stretch-wrap packaging from around the unit, exposing the protective corner and side packaging planks.

2.Remove the ramp, corner and side packaging planks from the unit, exposing the bag over the unit. Remove the bag when ready to install the Liebert XDH.

Figure 5 Removing shipping package

Exterior stretch wrapping surrounds other protec- tive shipping features

Ramp

(secured to the Liebert XDH by a layer of shrink-wrap)

NOTE:

One ramp will be shipped per order.

Planks at the corners and on the sides protect the Liebert XDH during shipping

Leave the plastic bag on the unit until it is off the pallet and ready to be installed

Ramp

(removed from pallet)

6

Image 10
Contents Liebert XDH General Safety Guidelines Fluorinated Greenhouse Gas Requirements-European UnionTable of Contents Specifications MaintenanceOperation Example XDH32BK Liebert XDH component locationsReferences Pre-Installation ChecksProduct Description Parts Included With the Liebert XDHInstallation Considerations Room PreparationProduct/System Description Checking and UnpackingEquipment Inspection Recyclable PackagingUnit Handling Unpacking the UnitTaking the Unit off the Pallet Prepare ramp to remove the Liebert XDH from shipping palletAttaching ramp, removing the Liebert XDH from pallet Determining Placement in the Conditioned Space Installing the Liebert XDH Within the Enclosure RowAirflow Direction XDHInstall Air Diffusers for Best Airflow Direction Change airflow directionSystem Connection Configuration European Union Fluorinated Greenhouse Gas RequirementsTypical Liebert XDH piping-non-interlaced connection Indirect system configuration-hydraulic system schematic Hard pipe connection diagram Connection Methods and PointsPiping Considerations-Hard-Piped Connections Venting the Holding Charge and Connecting to MainsRear of Liebert XDH Recommended Piping Size Connecting Methods-One-Shot ConnectionsConnection Methods for Hard Pipe Brazing PreparationsDegree Connection Header System Connecting Liebert XD Flex Pipes to Liebert XDH ModulesTools Required Liebert XD prefabricated piping assembly Tools Required Return Line Service Valve Supply InsulationConnecting High Voltage Wiring ElectricalConnecting Low Voltage Wiring-Optional Condensate wiring entry pointsChecklist for Proper Installation Charging with Refrigerant and Starting the Liebert XD SystemStart the Liebert XDH OperationInternal Access Fluorinated Greenhouse Gas RequirementsRemove Fan Tray Remove fan traySpecifications Liebert XD Flex Pipe assemblies, supply and return Page Ne t