Piping

5.3Connection Methods and Points

Refer to site specific drawings for general locations of the piping connections. For Liebert XDH con- nection locations, refer also to Figure 16.

The assembly and connection means used for piping in the Liebert XD system are the same as those used in conventional refrigeration systems. Observe all standard practices during installation and startup to prevent damage and contamination.

Supply piping connection is 1/2" OD copper pipe, and return piping connection is 7/8" OD copper. Both supply and return fittings may be supplied with optional one-shot connections. These fittings contain pressurized R-134a refrigerant inside the Liebert XDH.

The Liebert XDH has supply and return piping access on the top of each module.

Figure 15 Hard pipe connection diagram

Return Main (seen from end )

2-1/8" O.D. or 2-5/8" O.D.

Acceptable Arc

Supply Main (seen from end )

1-1/8" O.D. or 1-3/8" O.D.

1/2” Refrigerant -Grade

Full-Port Ball Valve

Field-Supplied and

Field- Installed

Recommended Arc

7/8” Refrigerant-Grade

Full-Port Ball Valve

Field-Supplied and

Field-Installed

 

Supply

 

 

 

 

to Cooling

Refer to Table 2 for details.

Module

Rear of

Liebert XDH

Copper Tubing Total length of each line from Liebert XDH to Main; not to exceed 72" (1829mm)

Return from Cooling Module

Top of

Liebert XDH

15

Image 19
Contents Liebert XDH Fluorinated Greenhouse Gas Requirements-European Union General Safety GuidelinesTable of Contents Specifications MaintenanceOperation Liebert XDH component locations Example XDH32BKParts Included With the Liebert XDH Pre-Installation ChecksProduct Description ReferencesRoom Preparation Installation ConsiderationsChecking and Unpacking Product/System DescriptionRecyclable Packaging Equipment InspectionUnpacking the Unit Unit HandlingPrepare ramp to remove the Liebert XDH from shipping pallet Taking the Unit off the PalletAttaching ramp, removing the Liebert XDH from pallet Installing the Liebert XDH Within the Enclosure Row Determining Placement in the Conditioned SpaceXDH Airflow DirectionChange airflow direction Install Air Diffusers for Best Airflow DirectionEuropean Union Fluorinated Greenhouse Gas Requirements System Connection ConfigurationTypical Liebert XDH piping-non-interlaced connection Indirect system configuration-hydraulic system schematic Connection Methods and Points Hard pipe connection diagramPiping Considerations-Hard-Piped Connections Venting the Holding Charge and Connecting to MainsRear of Liebert XDH Brazing Preparations Connecting Methods-One-Shot ConnectionsConnection Methods for Hard Pipe Recommended Piping SizeDegree Connection Header System Connecting Liebert XD Flex Pipes to Liebert XDH ModulesTools Required Liebert XD prefabricated piping assembly Tools Required Insulation Return Line Service Valve SupplyElectrical Connecting High Voltage WiringCondensate wiring entry points Connecting Low Voltage Wiring-OptionalCharging with Refrigerant and Starting the Liebert XD System Checklist for Proper InstallationOperation Start the Liebert XDHFluorinated Greenhouse Gas Requirements Internal AccessRemove fan tray Remove Fan TraySpecifications Liebert XD Flex Pipe assemblies, supply and return Page Ne t