Mechanical Considerations

Install Air Diffusers for Best Airflow Direction

1.Remove the top diffuser, Part # 186458, from its packaging.

2.Check the top diffuser’s fittings and insertion holes on the Liebert XDH to determine how the diffuser should be installed—the diffuser may be attached only one way on the top half of the Liebert XDH.

3.Rotate the diffuser 180 degrees and press it against the lower half of the Liebert XDH until it snaps into the fittings (see Figure 10).

The vanes in the diffuser now point in the opposite direction.

4.Repeat Steps 1 through 3 to install the bottom diffuser, Part # 186459, on the upper half of the Liebert XDH.

Figure 10 Change airflow direction

Top Diffuser, Part # 186459, may be rotated180 degrees and installed on the lower half of the Liebert XDH

11

Image 15
Contents Liebert XDH Fluorinated Greenhouse Gas Requirements-European Union General Safety GuidelinesTable of Contents Maintenance SpecificationsOperation Liebert XDH component locations Example XDH32BKParts Included With the Liebert XDH Pre-Installation ChecksProduct Description ReferencesRoom Preparation Installation ConsiderationsChecking and Unpacking Product/System DescriptionRecyclable Packaging Equipment InspectionUnpacking the Unit Unit HandlingPrepare ramp to remove the Liebert XDH from shipping pallet Taking the Unit off the PalletAttaching ramp, removing the Liebert XDH from pallet Installing the Liebert XDH Within the Enclosure Row Determining Placement in the Conditioned SpaceXDH Airflow DirectionChange airflow direction Install Air Diffusers for Best Airflow DirectionEuropean Union Fluorinated Greenhouse Gas Requirements System Connection ConfigurationTypical Liebert XDH piping-non-interlaced connection Indirect system configuration-hydraulic system schematic Connection Methods and Points Hard pipe connection diagramVenting the Holding Charge and Connecting to Mains Piping Considerations-Hard-Piped ConnectionsRear of Liebert XDH Brazing Preparations Connecting Methods-One-Shot ConnectionsConnection Methods for Hard Pipe Recommended Piping SizeDegree Connection Connecting Liebert XD Flex Pipes to Liebert XDH Modules Header SystemTools Required Liebert XD prefabricated piping assembly Tools Required Insulation Return Line Service Valve SupplyElectrical Connecting High Voltage WiringCondensate wiring entry points Connecting Low Voltage Wiring-OptionalCharging with Refrigerant and Starting the Liebert XD System Checklist for Proper InstallationOperation Start the Liebert XDHFluorinated Greenhouse Gas Requirements Internal AccessRemove fan tray Remove Fan TraySpecifications Liebert XD Flex Pipe assemblies, supply and return Page Ne t