Liebert XDH manual Equipment Inspection, Recyclable Packaging

Page 9

General product information

3.3Equipment Inspection

Upon arrival of the unit, and before unpacking, verify that the labeled equipment matches the Bill of Lading. Inspect all items for visible and concealed damage. Damage should be immediately reported to the carrier and a damage claim filed with a copy sent to Liebert Corporation or to your sales repre- sentative.

3.3.1Recyclable Packaging

All material used to package this unit is recyclable. Please save for future use or dispose of the material appropriately.

R

WARNING

! Risk of top-heavy unit falling over. Can cause death, injury and equipment damage.

Read all of the following instructions before attempting to move, lift, remove packaging from the unit, or preparing unit for installation.

CAUTION

! Risk of overhead interference. Can damage unit or structure.

The unit may be too tall to fit through a doorway while on the skid. Measure the unit and doorway heights and refer to the installation plans before moving the unit to verify clearances.

CAUTION

! Risk of sharp edges, splinters and exposed fasteners. Can cause personal injury.

Only properly trained personnel wearing appropriate safety headgear, gloves, shoes and glasses should attempt to move, lift, remove packaging from, or prepare unit for installation.

CAUTION

! Risk of damage from forklift. Can cause exterior and/or underside damage. Keep tines of the forklift level and at a height suitable to fit below the skid.

CAUTION

! Risk of hazardous environments. Can cause unit damage.

Keep the unit indoors and protected from dampness, freezing temperatures and contact damage.

Figure 4 Recommended unit handling equipment

Pallet Jack

Forklift

5

Image 9
Contents Liebert XDH Fluorinated Greenhouse Gas Requirements-European Union General Safety GuidelinesTable of Contents Maintenance SpecificationsOperation Liebert XDH component locations Example XDH32BKProduct Description Pre-Installation ChecksReferences Parts Included With the Liebert XDHRoom Preparation Installation ConsiderationsChecking and Unpacking Product/System DescriptionRecyclable Packaging Equipment InspectionUnpacking the Unit Unit HandlingPrepare ramp to remove the Liebert XDH from shipping pallet Taking the Unit off the PalletAttaching ramp, removing the Liebert XDH from pallet Installing the Liebert XDH Within the Enclosure Row Determining Placement in the Conditioned SpaceXDH Airflow DirectionChange airflow direction Install Air Diffusers for Best Airflow DirectionEuropean Union Fluorinated Greenhouse Gas Requirements System Connection ConfigurationTypical Liebert XDH piping-non-interlaced connection Indirect system configuration-hydraulic system schematic Connection Methods and Points Hard pipe connection diagramVenting the Holding Charge and Connecting to Mains Piping Considerations-Hard-Piped ConnectionsRear of Liebert XDH Connection Methods for Hard Pipe Connecting Methods-One-Shot ConnectionsRecommended Piping Size Brazing PreparationsDegree Connection Connecting Liebert XD Flex Pipes to Liebert XDH Modules Header SystemTools Required Liebert XD prefabricated piping assembly Tools Required Insulation Return Line Service Valve SupplyElectrical Connecting High Voltage WiringCondensate wiring entry points Connecting Low Voltage Wiring-OptionalCharging with Refrigerant and Starting the Liebert XD System Checklist for Proper InstallationOperation Start the Liebert XDHFluorinated Greenhouse Gas Requirements Internal AccessRemove fan tray Remove Fan TraySpecifications Liebert XD Flex Pipe assemblies, supply and return Page Ne t