Liebert XDH manual Determining Placement in the Conditioned Space

Page 13

Mechanical Considerations

4.0MECHANICAL CONSIDERATIONS

4.1Determining Placement in the Conditioned Space

The Liebert XDH units should be placed among the cabinets that generate the greatest amount of heat. If heat loads are dispersed evenly throughout the room, the Liebert XDH modules may be spread out accordingly.

The Liebert XDH is engineered to fit among computer enclosure cabinets. Figure 8, below, illustrates the unit’s dimensions.

Figure 8 Liebert XDH dimensions

12"

(305mm)

80"

(2032mm)

78"

(1981mm)

42

(1067mm)

FRONT

FRONT

4.2Installing the Liebert XDH Within the Enclosure Row

Built-in casters allow rolling the Liebert XDH into position for installation. Stabilizers reduce the like- lihood of the unit tipping over. These stabilizers must be removed before the unit is positioned in the row. Adjustable leveling feet prevent it from moving after positioning.

Once positioned, the Liebert XDH must be secured either to the floor with the included shipping brackets or to an adjacent cabinet. An adjustable bracket (Liebert P/N 187642G1) for attaching the Liebert XDH to an adjacent cabinet is included with each unit.

9

Image 13
Contents Liebert XDH Fluorinated Greenhouse Gas Requirements-European Union General Safety GuidelinesTable of Contents Specifications MaintenanceOperation Liebert XDH component locations Example XDH32BKProduct Description Pre-Installation ChecksReferences Parts Included With the Liebert XDHRoom Preparation Installation ConsiderationsChecking and Unpacking Product/System DescriptionRecyclable Packaging Equipment InspectionUnpacking the Unit Unit HandlingPrepare ramp to remove the Liebert XDH from shipping pallet Taking the Unit off the PalletAttaching ramp, removing the Liebert XDH from pallet Installing the Liebert XDH Within the Enclosure Row Determining Placement in the Conditioned SpaceXDH Airflow DirectionChange airflow direction Install Air Diffusers for Best Airflow DirectionEuropean Union Fluorinated Greenhouse Gas Requirements System Connection ConfigurationTypical Liebert XDH piping-non-interlaced connection Indirect system configuration-hydraulic system schematic Connection Methods and Points Hard pipe connection diagramPiping Considerations-Hard-Piped Connections Venting the Holding Charge and Connecting to MainsRear of Liebert XDH Connection Methods for Hard Pipe Connecting Methods-One-Shot ConnectionsRecommended Piping Size Brazing PreparationsDegree Connection Header System Connecting Liebert XD Flex Pipes to Liebert XDH ModulesTools Required Liebert XD prefabricated piping assembly Tools Required Insulation Return Line Service Valve SupplyElectrical Connecting High Voltage WiringCondensate wiring entry points Connecting Low Voltage Wiring-OptionalCharging with Refrigerant and Starting the Liebert XD System Checklist for Proper InstallationOperation Start the Liebert XDHFluorinated Greenhouse Gas Requirements Internal AccessRemove fan tray Remove Fan TraySpecifications Liebert XD Flex Pipe assemblies, supply and return Page Ne t