Magnum | Installation and User Guide 03/06) |
because of the blocking action of the diodes. This is true even if one input connection is reversed while the Switch is operating from the other source.
e)The Switch will not receive power (and will not work) when both inputs are simultaneously absent or are both incorrectly connected.
C5.0 INSTALLATION
This section describes the proper connection of the
125VDC power terminal block on the Magnum 6Ks Switch
as shown in Fig. |
| |
The | ||
Switch, as shown in Fig C5.0 is |
| |
DC Terminal | ||
located on the left front of the unit | ||
Block | ||
and is equipped with five (5) |
| |
|
The primary terminals are identified as positive (A+),
negative
Src, wiring connections to the External Terminal Block on a Magnum 6K8
Note: The GND should be hooked up first. The
The connection procedure is straightforward. Simply connect the DC leads to the Switch’s power terminals, positive (+) and negative
The 24VDC & 125VDC terminal block on Magnum
C5.1 UL Requirements
The following must be adhered to in order to conform to UL requirements:
1.Minimum 18 AWG cable for connection to a Centralized DC power source.
2.Minimum 14 AWG cable for connection to earthing wiring.
3.Use only with Listed 10 A circuit breaker provided in building installation.
4.“Complies with FDA radiation performance standards, 21 CFR subchapter J.” or equivalent.
5.Fastening torque of the lugs on the terminal block: 9 inch pound max. www . GarrettCom . com
63