Magnum
referred to as “6KPMV” for convenience in describing port module installation.
Magnum
http://www.garrettcom.com/Pictorial/6k8_pictorial.pdf
3.6.1 Preparation for Installing and Removing 6KPMVs from 6K8’s
STOP!!!
Be sure the power cord is unplugged
from the chassis before attempting to remove
and/or replace any PM cards.
Failure to do so may result in damage to the unit
and will void the warranty.
Caution- Avoid Static Discharge: The port modules (like most electronic equipment) are sensitive to static discharge. Use proper ESD measures when handling port modules.
Step 1. Make sure the 6KPMV Card package has all necessary accessories and use the proper tool to install it properly. Each 6KPMV Card package, for field installation contains (Daughterboard (Bigger) and Granddaughter board (smaller), three 5/8 stand offs for Granddaughter board, 6 standoff for daughter Board, nine
NOTE: Every 6KPMV Card package comes with their matching Daughter and Granddaughter board. The copper 6KPMV card should not work properly if mixed with other Fiber combo 6KPMV card packages. Always install the PM module separately one by one to avoid the mixing.
Do not change the Blue color DIP Switch setting ever! Leave it at factory default.
Step 2. Remove Chassis Cover
www . GarrettCom . com
32