Force10 Networks manual Installing the AC Chassis, Unpacking the E1200i AC System

Page 23

Chapter 4 Installing the AC Chassis

This chapter provides instructions to rack mount your E1200i AC system into a standard 19-inch or

23-inch equipment rack. It contains the following sections:

Unpacking the E1200i AC System

Installing the Equipment Rack Shelf Bar

Standard Front Chassis Mounting

Installing the Chassis into an Equipment Cabinet

Unpacking the E1200i AC System

The E1200i AC system and components are shipped on a wooden pallet with Front Shipping cover. Remove the chassis from the shipping packaging and move the chassis with a hand cart, pallet jack, or fork lift to its rack. Do not unpack the power supplies, fan trays, air filter, or cards until the chassis is installed.

Warning: The E1200i AC shipping containers each weigh up to 400 pounds. The unpacked chassis and pallet weigh approximately 200 pounds. Do not attempt to lift or move the chassis without the use of a hand cart, pallet jack, or forklift.

Caution: Lift the E1200i AC chassis only with the handles provided or from the bottom. Lifting by the chassis shelves will cause chassis damage. Do not remove the shipping cover during the installation process. The cover prevents damage to the internal framework and EMI seals.

Warning: Electrostatic discharge (ESD) damage can occur when components are mishandled. Always wear an ESD-preventative wrist or foot-heal ground strap when handling RPMs, SFMs, or line cards. After you remove the original packaging, place RPMs, SFMs, and line cards directly into the chassis, or on an antistatic surface.

Warning: Complete the chassis installation into the rack before you install any other component (fan trays, power supplies, line cards, RPMs, SFMs, cables).

Installing and Maintaining the E1200i System

23

Image 23
Contents Installing and Maintaining the E1200i System Copyright 2008 Force10 Networks Contents Installing Fan Trays Appendix B System Boot Index List of Figures Page List of Tables Page Symbol Description Defines the information symbols used throughout this guideRelated Publications Operating Overview E1200i SystemPage Page RPM Component Minimum Maximum Field-Replaceable Step Task Section Supplying Power DC onSite Selection Criteria Chapter Site PreparationRack Mounting Cabinet PlacementPower Fans and Airflow Storing Components Unpacking the E1200i AC System Installing the AC ChassisStep Task Installing the Equipment Rack Shelf BarTo install a equipment rack shelf bar Standard Front Chassis MountingTo install the chassis into a prepared rack Installing the Chassis into an Equipment CabinetInstalling the AC Chassis Unpacking the E1200i DC System Installing the DC ChassisInstalling the DC Chassis Rack-Mounting the Chassis Installing the DC Chassis Installing Fan Trays Screw latch Installing Fan Trays Location To install fan traysIs an illustration of the fan tray safety labels LabelInstalling Fan Trays On/Standby Switch Installing AC Power SuppliesSecuring the Chassis Ground Installing Power SuppliesInsert power supply AC Power Supply and Fan Operability TestStatus LED is Step TaskStatus Installing AC Power Supplies PEM 0 and PEM 1 Chassis Locations Installing DC Power SuppliesInstalling DC PEMs Cable and Connector RequirementsUse the following steps to install a DC PEM Over current protector PEM interlock lever Locking screws Cable Connector Required for E1200i DC PEM DC PEM with Connections in Place DC Power Supply and Fan Operability Test Step Task Important Points to Remember Installing RPMs, Line Cards SFMsUnpacking an RPM or Line Card Line Cards Installing Line Cards and RPMsRPMs Blank Panels Preparing and Installing RPMs and Line CardsInstalling an RPM into the E1200i To install line cards and RPMsSection Label Description Installing a Second RPMRPM Label and LEDs Describes the RPM LED states and the RPM front panelInstalling Switch Fabric Modules SFMs Illustrates the SFM front panel and LEDs SFM Front Panel and LEDsLine Card Cable Management Systems RPM Ports Connecting the Console and Auxiliary PortsRPM Ports and Cables Cable and Adapter Pin Assignments Pin Signal Input/OutputAccessing the Console with a DB-25 Adapter Accessing the Console with a DB-9 AdapterLabel Description Accessing the 10/100 Ethernet Management PortAccessing the Auxiliary Port by Modem Preparation Chapter Powering UpSupplying Power DC Supplying Power ACBooting from the Bootuser Prompt Booting to the CLI PromptPowering Up Removing and Replacing Fan Trays Removing and Replacing ComponentsRemoving and Replacing Components Removing and Replacing AC Power SuppliesInstalling and Maintaining the E1200i System Remove an AC Power Supply in a redundant installation Removing and Replacing DC Power SuppliesRemove an AC Power Supply in a non-redundant installation Installing and Maintaining the E1200i System Remove a DC Power Supply To remove and replace E1200i line card or RPM modules Removing and Replacing RPMs, Line Cards, or SFMsRemoving and Replacing line cards or RPMs No linecard Removing and Replacing SFMsTo remove and replace an SFM To remove and replace the air filter Removing and Replacing the Air FilterRemoving and Replacing Components Inserting the External Flash Memory Card Appendix a Using a Flash Memory CardExternal Flash Memory Card Overview To remove the flash memory card To install the flash memory cardRemoving the External Flash Memory Card Formatting an External Flash CardDisplaying Files Stored on the External Flash Command Syntax Command Mode PurposeCopying Files to the External Flash Page Booting from the Bootuser Prompt System Boot ProcessStep Command To configure the chassis from the Bootuser promptStep Command Task Show boot selectorShow bootvar Port View the Management interface’s physical settingsAuto-negotiation Show default-gateway Default-gateway ip-address Step CommandTaskReload System Boot Appendix C Alarms Power Supplies and Alarms SFMs and Alarms Alarms This appendix contains two major sections Appendix D System SpecificationsE1200i AC System Power Requirements E1200i AC Chassis Physical DesignSystem Specifications E1200i DC Chassis Physical Design E1200i DC System Power RequirementsNon-operating Environmental SpecificationsOperating Specifications Agency ComplianceKorea MIC certification Safety Standards and Compliance Agency CertificationsJapan Vcci Compliance for Class a Equipment Product Recycling and Disposal Electromagnetic EmissionsImmunity European Weee symbol System Specifications This appendix contains these major sections Appendix E Technical SupportSupport Policies section of iSupport Accessing iSupport ServicesConsole captures showing the troubleshooting steps taken Output from the show tech-supportnon-paged command ThisOutput from the show logging eventlog unit command, where Console captures showing the error messagesTo request replacement hardware, follow these steps Requesting a Hardware ReplacementFPC Asic Index104 Index Installing and Maintaining the E1200i System 105