Force10 Networks E1200i RPM Label and LEDs, Installing a Second RPM, Section Label Description

Page 53

Installing a Second RPM

Note: If your system contains two RPMs, both RPMs must contain the same software image.

Install a second RPM either before the system is powered on or after the Primary RPM is up and stable. After the second RPM is installed, wait several seconds until the connection between the two RPMs is established before configuring any commands. Below is an example of the messages that should appear:

%POLLMGR-2-ALT_RPM_STATE: Alternate RPM is present

%IRC-6-IRC_COMMUP: Link to peer RPM is up

%RAM-6-RAM_TASK: RPM1 is in Standby State.

Once the link between the two RPMs is established, copy the running configuration to the startup configuration.

RPM Label and LEDs

Table 6 describes the RPM LED states and the RPM front panel.

Table 6 RPM LEDs

Section

Label

Description

 

 

 

Management

10/100

L: Green: link is up

 

Ethernet

A: Green: activity on port

 

 

 

 

 

Alarms

Major

Red: a critical condition exists, such as a severe over temperature condition, a fan

 

 

tray failure, an overcurrent condition in a power supply, or an out-of-tolerance

 

 

voltage.

 

 

The RPM LEDs are controlled by software which sets the threshold levels for

 

 

triggering the different stages of alarms.

 

 

Unlit: no major conditions

 

 

 

 

Minor

Amber: a serious condition exists, such as an over temperature condition, a single

 

 

fan failure, or a line card failure. The RPM LEDs are controlled by software,

 

 

which sets the threshold levels for triggering the different stages of alarms.

 

 

Unlit: no minor alarm conditions

 

 

 

 

ACO/LT

Allows you to test the operability of LEDs to verify that they are able to light.

 

 

Press the ACO/LT button to temporarily illuminate the LEDs on the RPM.

 

 

If you press this button when the alarm status LED is lit, the alarm relay contacts are

 

 

reset until the next alarm event.

Flash

In Use

Green: flash memory card is in the process of a read or write process. Do not

 

 

remove the flash card when the In Use LED is lit.

 

 

Unlit: not in use

 

 

 

Installing and Maintaining the E1200i System

53

Image 53
Contents Installing and Maintaining the E1200i System Copyright 2008 Force10 Networks Contents Installing Fan Trays Appendix B System Boot Index List of Figures Page List of Tables Page Symbol Description Defines the information symbols used throughout this guideRelated Publications Operating Overview E1200i SystemPage Page RPM Component Minimum Maximum Field-Replaceable Step Task Section Supplying Power DC onSite Selection Criteria Chapter Site PreparationRack Mounting Cabinet PlacementPower Fans and Airflow Storing Components Unpacking the E1200i AC System Installing the AC ChassisTo install a equipment rack shelf bar Installing the Equipment Rack Shelf BarStandard Front Chassis Mounting Step TaskTo install the chassis into a prepared rack Installing the Chassis into an Equipment CabinetInstalling the AC Chassis Unpacking the E1200i DC System Installing the DC ChassisInstalling the DC Chassis Rack-Mounting the Chassis Installing the DC Chassis Installing Fan Trays Screw latch Installing Fan Trays Is an illustration of the fan tray safety labels To install fan traysLabel LocationInstalling Fan Trays On/Standby Switch Installing AC Power SuppliesSecuring the Chassis Ground Installing Power SuppliesInsert power supply AC Power Supply and Fan Operability TestStatus LED is Step TaskStatus Installing AC Power Supplies PEM 0 and PEM 1 Chassis Locations Installing DC Power SuppliesInstalling DC PEMs Cable and Connector RequirementsUse the following steps to install a DC PEM Over current protector PEM interlock lever Locking screws Cable Connector Required for E1200i DC PEM DC PEM with Connections in Place DC Power Supply and Fan Operability Test Step Task Important Points to Remember Installing RPMs, Line Cards SFMsUnpacking an RPM or Line Card Line Cards Installing Line Cards and RPMsRPMs Blank Panels Preparing and Installing RPMs and Line CardsInstalling an RPM into the E1200i To install line cards and RPMsRPM Label and LEDs Installing a Second RPMDescribes the RPM LED states and the RPM front panel Section Label DescriptionInstalling Switch Fabric Modules SFMs Illustrates the SFM front panel and LEDs SFM Front Panel and LEDsLine Card Cable Management Systems RPM Ports Connecting the Console and Auxiliary PortsRPM Ports and Cables Cable and Adapter Pin Assignments Pin Signal Input/OutputAccessing the Console with a DB-25 Adapter Accessing the Console with a DB-9 AdapterLabel Description Accessing the 10/100 Ethernet Management PortAccessing the Auxiliary Port by Modem Preparation Chapter Powering UpSupplying Power DC Supplying Power ACBooting from the Bootuser Prompt Booting to the CLI PromptPowering Up Removing and Replacing Fan Trays Removing and Replacing ComponentsRemoving and Replacing Components Removing and Replacing AC Power SuppliesInstalling and Maintaining the E1200i System Remove an AC Power Supply in a redundant installation Removing and Replacing DC Power SuppliesRemove an AC Power Supply in a non-redundant installation Installing and Maintaining the E1200i System Remove a DC Power Supply To remove and replace E1200i line card or RPM modules Removing and Replacing RPMs, Line Cards, or SFMsRemoving and Replacing line cards or RPMs No linecard Removing and Replacing SFMsTo remove and replace an SFM To remove and replace the air filter Removing and Replacing the Air FilterRemoving and Replacing Components Inserting the External Flash Memory Card Appendix a Using a Flash Memory CardExternal Flash Memory Card Overview Removing the External Flash Memory Card To install the flash memory cardFormatting an External Flash Card To remove the flash memory cardDisplaying Files Stored on the External Flash Command Syntax Command Mode PurposeCopying Files to the External Flash Page Booting from the Bootuser Prompt System Boot ProcessStep Command To configure the chassis from the Bootuser promptStep Command Task Show boot selectorShow bootvar Port View the Management interface’s physical settingsAuto-negotiation Show default-gateway Default-gateway ip-address Step CommandTaskReload System Boot Appendix C Alarms Power Supplies and Alarms SFMs and Alarms Alarms E1200i AC System Power Requirements Appendix D System SpecificationsE1200i AC Chassis Physical Design This appendix contains two major sectionsSystem Specifications E1200i DC Chassis Physical Design E1200i DC System Power RequirementsOperating Specifications Environmental SpecificationsAgency Compliance Non-operatingKorea MIC certification Safety Standards and Compliance Agency CertificationsJapan Vcci Compliance for Class a Equipment Product Recycling and Disposal Electromagnetic EmissionsImmunity European Weee symbol System Specifications This appendix contains these major sections Appendix E Technical SupportSupport Policies section of iSupport Accessing iSupport ServicesOutput from the show logging eventlog unit command, where Output from the show tech-supportnon-paged command ThisConsole captures showing the error messages Console captures showing the troubleshooting steps takenTo request replacement hardware, follow these steps Requesting a Hardware ReplacementFPC Asic Index104 Index Installing and Maintaining the E1200i System 105