Force10 Networks E1200i manual Chapter Powering Up, Preparation

Page 61

Chapter 11

Powering Up

 

 

This chapter provides instructions for powering up your E1200i AC or DC system after you have installed all the chassis components and made your power and network connections. It covers the following topics:

Preparation

Supplying Power - AC

Supplying Power - DC

Booting to the CLI Prompt

Preparation

Note: Make sure that the switch on the remote power source is in the OFF position until you are ready to supply power to the chassis.

Before you supply power to your chassis, Force10 Networks recommends that you re-inspect your equipment rack and chassis.

Verify that:

The equipment rack is properly secured and grounded.

The chassis is bolted and secured into your equipment rack.

The chassis is grounded.

Each power supply module is properly installed and secured.

The AC-Cord Retainer is installed, if applicable (AC systems).

The power switch is in the OFF position, if applicable (DC systems).

Power cables connect to a compliant remote power source.

Both fan trays are installed and secured.

All line cards, RPMs, and SFMs are properly installed and secured.

All chassis slots are filled. Blank panels and covers are installed in all empty slots.

Danger: Leakage Current (High Touch Current): The AC power cords are secured to the power inlet using the provided bracket. The power cord plugs must be secured to the building outlets by the chassis installer or a qualified electrician.

Installing and Maintaining the E1200i System

61

Image 61
Contents Installing and Maintaining the E1200i System Copyright 2008 Force10 Networks Contents Installing Fan Trays Appendix B System Boot Index List of Figures Page List of Tables Page Symbol Description Defines the information symbols used throughout this guideRelated Publications Operating Overview E1200i SystemPage Page RPM Component Minimum Maximum Field-Replaceable Step Task Section Supplying Power DC onSite Selection Criteria Chapter Site PreparationPower Cabinet PlacementRack Mounting Fans and Airflow Storing Components Unpacking the E1200i AC System Installing the AC ChassisTo install a equipment rack shelf bar Installing the Equipment Rack Shelf BarStandard Front Chassis Mounting Step TaskTo install the chassis into a prepared rack Installing the Chassis into an Equipment CabinetInstalling the AC Chassis Unpacking the E1200i DC System Installing the DC ChassisInstalling the DC Chassis Rack-Mounting the Chassis Installing the DC Chassis Installing Fan Trays Screw latch Installing Fan Trays Is an illustration of the fan tray safety labels To install fan traysLabel LocationInstalling Fan Trays On/Standby Switch Installing AC Power SuppliesSecuring the Chassis Ground Installing Power SuppliesInsert power supply AC Power Supply and Fan Operability TestStatus LED is Step TaskStatus Installing AC Power Supplies PEM 0 and PEM 1 Chassis Locations Installing DC Power SuppliesInstalling DC PEMs Cable and Connector RequirementsUse the following steps to install a DC PEM Over current protector PEM interlock lever Locking screws Cable Connector Required for E1200i DC PEM DC PEM with Connections in Place DC Power Supply and Fan Operability Test Step Task Unpacking an RPM or Line Card Installing RPMs, Line Cards SFMsImportant Points to Remember RPMs Installing Line Cards and RPMsLine Cards Blank Panels Preparing and Installing RPMs and Line CardsInstalling an RPM into the E1200i To install line cards and RPMsRPM Label and LEDs Installing a Second RPMDescribes the RPM LED states and the RPM front panel Section Label DescriptionInstalling Switch Fabric Modules SFMs Illustrates the SFM front panel and LEDs SFM Front Panel and LEDsLine Card Cable Management Systems RPM Ports and Cables Connecting the Console and Auxiliary PortsRPM Ports Cable and Adapter Pin Assignments Pin Signal Input/OutputAccessing the Console with a DB-25 Adapter Accessing the Console with a DB-9 AdapterAccessing the Auxiliary Port by Modem Accessing the 10/100 Ethernet Management PortLabel Description Preparation Chapter Powering UpSupplying Power DC Supplying Power ACBooting from the Bootuser Prompt Booting to the CLI PromptPowering Up Removing and Replacing Fan Trays Removing and Replacing ComponentsRemoving and Replacing Components Removing and Replacing AC Power SuppliesInstalling and Maintaining the E1200i System Remove an AC Power Supply in a non-redundant installation Removing and Replacing DC Power SuppliesRemove an AC Power Supply in a redundant installation Installing and Maintaining the E1200i System Remove a DC Power Supply Removing and Replacing line cards or RPMs Removing and Replacing RPMs, Line Cards, or SFMsTo remove and replace E1200i line card or RPM modules To remove and replace an SFM Removing and Replacing SFMsNo linecard To remove and replace the air filter Removing and Replacing the Air FilterRemoving and Replacing Components External Flash Memory Card Overview Appendix a Using a Flash Memory CardInserting the External Flash Memory Card Removing the External Flash Memory Card To install the flash memory cardFormatting an External Flash Card To remove the flash memory cardCopying Files to the External Flash Command Syntax Command Mode PurposeDisplaying Files Stored on the External Flash Page Booting from the Bootuser Prompt System Boot ProcessStep Command To configure the chassis from the Bootuser promptStep Command Task Show boot selectorShow bootvar Auto-negotiation View the Management interface’s physical settingsPort Show default-gateway Default-gateway ip-address Step CommandTaskReload System Boot Appendix C Alarms Power Supplies and Alarms SFMs and Alarms Alarms E1200i AC System Power Requirements Appendix D System SpecificationsE1200i AC Chassis Physical Design This appendix contains two major sectionsSystem Specifications E1200i DC Chassis Physical Design E1200i DC System Power RequirementsOperating Specifications Environmental SpecificationsAgency Compliance Non-operatingJapan Vcci Compliance for Class a Equipment Safety Standards and Compliance Agency CertificationsKorea MIC certification Immunity Electromagnetic EmissionsProduct Recycling and Disposal European Weee symbol System Specifications This appendix contains these major sections Appendix E Technical SupportSupport Policies section of iSupport Accessing iSupport ServicesOutput from the show logging eventlog unit command, where Output from the show tech-supportnon-paged command ThisConsole captures showing the error messages Console captures showing the troubleshooting steps takenTo request replacement hardware, follow these steps Requesting a Hardware ReplacementFPC Asic Index104 Index Installing and Maintaining the E1200i System 105