Force10 Networks E1200i manual Supplying Power AC, Supplying Power DC

Page 62

Supplying Power - AC

Step Task

1.Flip the REMOTE power switch to the ON position.

2.Flip the On/Standby switch to the ON position.

3.The Status LED for each power supply should be green (online). If a power supply’s LED is not lit or is amber:

ensure that the unit is properly installed.

Verify the power source.

If the power supply’s LED remains unlit, power off the remote power source and replace the unit.

4.Both fan tray LEDs should be green (online). Verify that air is flowing through the chassis. If a fan tray is not operating properly or air is not flowing through the chassis:

power off the chassis at the remote power source.

Ensure that the fan tray is properly installed.

Verify the power source.

If the fan tray LED remains unlit on power-up, replace the fan tray.

To turn the chassis power off, flip the On/Standby switch to the Standby position.

Note: The AC power supplies status LEDs will remain lit and the power supply fans will continue to operate, even though DC power to the backplane has been turned off.

Supplying Power - DC

Step Task

1.Flip the REMOTE power switch to the ON position.

2.The Status LED for each power supply should be green (online). If a power supply’s LED is not lit or is amber:

ensure that the unit is properly installed.

Verify the power source.

If the power supply’s LED remains unlit, power off the remote power source and replace the unit.

3.Both fan tray LEDs should be green (online). Verify that air is flowing through the chassis. If a fan tray is not operating properly or air is not flowing through the chassis:

power off the chassis at the remote power source.

Ensure that the fan tray is properly installed.

Verify the power source.

If the fan tray LED remains unlit on power-up, replace the fan tray.

62

Powering Up

Image 62
Contents Installing and Maintaining the E1200i System Copyright 2008 Force10 Networks Contents Installing Fan Trays Appendix B System Boot Index List of Figures Page List of Tables Page Defines the information symbols used throughout this guide Symbol DescriptionRelated Publications E1200i System Operating OverviewPage Page RPM Component Minimum Maximum Field-Replaceable Supplying Power DC on Step Task SectionChapter Site Preparation Site Selection CriteriaRack Mounting Cabinet PlacementPower Fans and Airflow Storing Components Installing the AC Chassis Unpacking the E1200i AC SystemStandard Front Chassis Mounting Installing the Equipment Rack Shelf BarTo install a equipment rack shelf bar Step TaskInstalling the Chassis into an Equipment Cabinet To install the chassis into a prepared rackInstalling the AC Chassis Installing the DC Chassis Unpacking the E1200i DC SystemInstalling the DC Chassis Rack-Mounting the Chassis Installing the DC Chassis Installing Fan Trays Screw latch Installing Fan Trays Label To install fan traysIs an illustration of the fan tray safety labels LocationInstalling Fan Trays Installing AC Power Supplies On/Standby SwitchInstalling Power Supplies Securing the Chassis GroundAC Power Supply and Fan Operability Test Insert power supplyStep Task Status LED isStatus Installing AC Power Supplies Installing DC Power Supplies PEM 0 and PEM 1 Chassis LocationsCable and Connector Requirements Installing DC PEMsUse the following steps to install a DC PEM Over current protector PEM interlock lever Locking screws Cable Connector Required for E1200i DC PEM DC PEM with Connections in Place DC Power Supply and Fan Operability Test Step Task Important Points to Remember Installing RPMs, Line Cards SFMsUnpacking an RPM or Line Card Line Cards Installing Line Cards and RPMsRPMs Preparing and Installing RPMs and Line Cards Blank PanelsTo install line cards and RPMs Installing an RPM into the E1200iDescribes the RPM LED states and the RPM front panel Installing a Second RPMRPM Label and LEDs Section Label DescriptionInstalling Switch Fabric Modules SFMs SFM Front Panel and LEDs Illustrates the SFM front panel and LEDsLine Card Cable Management Systems RPM Ports Connecting the Console and Auxiliary PortsRPM Ports and Cables Pin Signal Input/Output Cable and Adapter Pin AssignmentsAccessing the Console with a DB-9 Adapter Accessing the Console with a DB-25 AdapterLabel Description Accessing the 10/100 Ethernet Management PortAccessing the Auxiliary Port by Modem Chapter Powering Up PreparationSupplying Power AC Supplying Power DCBooting to the CLI Prompt Booting from the Bootuser PromptPowering Up Removing and Replacing Components Removing and Replacing Fan TraysRemoving and Replacing AC Power Supplies Removing and Replacing ComponentsInstalling and Maintaining the E1200i System Remove an AC Power Supply in a redundant installation Removing and Replacing DC Power SuppliesRemove an AC Power Supply in a non-redundant installation Installing and Maintaining the E1200i System Remove a DC Power Supply To remove and replace E1200i line card or RPM modules Removing and Replacing RPMs, Line Cards, or SFMsRemoving and Replacing line cards or RPMs No linecard Removing and Replacing SFMsTo remove and replace an SFM Removing and Replacing the Air Filter To remove and replace the air filterRemoving and Replacing Components Inserting the External Flash Memory Card Appendix a Using a Flash Memory CardExternal Flash Memory Card Overview Formatting an External Flash Card To install the flash memory cardRemoving the External Flash Memory Card To remove the flash memory cardDisplaying Files Stored on the External Flash Command Syntax Command Mode PurposeCopying Files to the External Flash Page System Boot Process Booting from the Bootuser PromptTo configure the chassis from the Bootuser prompt Step CommandShow boot selector Step Command TaskShow bootvar Port View the Management interface’s physical settingsAuto-negotiation Step CommandTask Show default-gateway Default-gateway ip-addressReload System Boot Appendix C Alarms Power Supplies and Alarms SFMs and Alarms Alarms E1200i AC Chassis Physical Design Appendix D System SpecificationsE1200i AC System Power Requirements This appendix contains two major sectionsSystem Specifications E1200i DC System Power Requirements E1200i DC Chassis Physical DesignAgency Compliance Environmental SpecificationsOperating Specifications Non-operatingKorea MIC certification Safety Standards and Compliance Agency CertificationsJapan Vcci Compliance for Class a Equipment Product Recycling and Disposal Electromagnetic EmissionsImmunity European Weee symbol System Specifications Appendix E Technical Support This appendix contains these major sectionsAccessing iSupport Services Support Policies section of iSupportConsole captures showing the error messages Output from the show tech-supportnon-paged command ThisOutput from the show logging eventlog unit command, where Console captures showing the troubleshooting steps takenRequesting a Hardware Replacement To request replacement hardware, follow these stepsIndex FPC Asic104 Index Installing and Maintaining the E1200i System 105