Completing the Installation
Modem Port Adapter Wiring and Signal Diagram
RJ45 |
| DB25 |
|
Pin | Conductor | Pin | Signal |
1 | Blue | 2 | Transmit (TX) |
2 | Orange | 8 | Data Carrier Detect (DCD) |
4 | Red | 3 | Receive |
5 | Green | 7 | Ground (GRD) |
6 | Yellow | 20 | Data Terminal Ready (DTR) |
8 | Gray | 22 | Ring Indicator |
| Pins |
| Pins |
1 | 8 | 1 | 13 |
RJ45 Connector (Female) | 14 | 25 | |
|
| ||
|
| DB25 Connector (Male) |
Completing the Installation
Completing the DFE module installation depends on if the module is being installed in:
•a new DFE module system (refer to “Completing the Installation” on page 3‐24), or
•an established, operating DFE module system (refer to “Completing the Installation of a DFE‐Gold Module in an Existing System” on page 3‐26).
Completing the Installation of a New System
In a new system of DFE modules, one of the installed DFE modules will become the management module on chassis power up, and all DFE modules will automatically be set to the factory default values. A complete list of the factory default values are provided in Chapter 3 of the Enterasys Matrix DFE‐Gold Series Configuration Guide.
After installing all DFE modules into the host chassis and making the connections to the network, proceed to “First‐Time Log‐In Using a Console Port Connection” on page 3‐25 to access the module management startup screen from your PC, terminal, or modem connection.